A support method for the caving zone and broken zone of the metal underground mine roadway
A technology of caving area and broken zone, which is applied in the direction of mine roof supports, underground chambers, tunnels, etc., can solve the problems of caving, safety and high construction efficiency, and achieve the effect of solving high labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific embodiments are described in detail with reference to the accompanying drawings, but the present invention is not limited thereto.
[0033] refer to Figure 1 to Figure 8
[0034] A support method for the caving zone and broken zone of a metal underground mine roadway, comprising the following steps:
[0035] 1) According to the length of the falling area or the broken zone 1, install the support rail 2 on both sides of the ground in the roadway in advance. In order to consider the problem of equipment transportation, the length of the rail is designed to be 1-1.5m, and the rails can be extended by bolts; and Install the first arch support 10 that is provided with the inverted U-shaped track 11 along its outline in the safe area at one end of the roadway;
[0036] 2) According to the length of the falling area or the broken zone, guide rods...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


