Overall two-step lifting construction method of string tension prestressed steel structure network frame with hanging layer
A prestressed steel and steel structure technology, applied in the construction of the overall lifting, the overall two-step lifting construction field of the string prestressed steel structure grid, can solve the problem of long construction period, small construction site, no super large tonnage crane, etc. problems, to achieve the effect of reducing the difficulty of installation and construction, solving difficult guarantees, avoiding cost increases and quality problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] A two-step overall lifting construction method for a tensioned prestressed steel structure network frame with a hanging layer. The construction steps include: 1) erecting a full scaffolding in the hollow area of the third-floor roof of the control center building; 2) setting 12 scaffolds on the overall platform. three) use MIDAS / GEN software to simulate and analyze the steel structure grid structure; four) assemble and weld the steel structure grid on the overall platform; The overall control is lifted in place in 2 steps; 6) one step is lifted to a suitable height to install the suspension layer and steel cables, the second step is lifted to the design level and then the post-repair rod installation is carried out; and 7) the final prestressed tension construction and Grading unloading;
[0041] One) to seven) construction steps, its concrete operation is as follows:
[0042] 1) Set up a full house of scaffolding in the hollow area of the roof on the third floor o...