Bridge of crane and crane
A crane and bridge technology, applied in the field of hoisting machinery, can solve the problems of difficulty in ensuring installation accuracy, inconvenient installation, etc., and achieve the effects of reducing workload, facilitating maintenance and reuse, and convenient and quick installation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Please also refer to Figure 1-4 , the present embodiment provides a crane bridge, including a main girder 100 and two end girders 200 arranged at both ends of the main girder 100 and perpendicular to the main girder 100, specifically:
[0035] The main beam 100 overlaps the upper parts of the two end beams 200 , and the main beam 100 and the end beams 200 are connected by a hinge device 300 .
[0036] The bridge frame of the crane includes the main girder 100 and the end girder 200, which constitute the metal structure skeleton of the crane to bear and transmit various working loads, natural loads and self-weight loads borne by the crane. The end girder 200 is arranged at both ends of the main girder 100 Therefore, there are two end girders 200, and the end girder 200 is vertically arranged relative to the main girder 100, which constitutes the basic form of the bridge frame. On the two end beams 200, the force of the main beam 100 is transmitted through the end beams...
Embodiment 2
[0046] This embodiment provides a crane, including the bridge frame of the crane in Embodiment 1. The crane also includes a trolley mounted on the main girder 100, a trolley operating mechanism located at the bottom of the two ends of the end beam 200, an electrical device for providing lifting and operating power for the trolley and the trolley operating mechanism, and equipment The railing on the main girder 100 and the driver's cab connected to the main girder 100, because the bridge frame of the crane adopts the hinged connection mode of the main girder 100 and the end girder 200, avoiding the use of traditional bolts used between the main girder 100 and the end girder 200 The connection method makes the installation of the main girder 100 and the end girder 200 convenient and fast, and the preset hinge device 300 on the main girder 100 and the end girder 200 compared with the preset bolt holes of the traditional connection method reduces the manufacturing process and speed...