Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] A construction site sewage efficient treatment equipment, such as Figure 1-3 As shown, it includes a leg 1, a first box body 2, a first outlet pipe 3, a first horizontal plate 4, a sewage treatment device 5, a sewage treatment mechanism 6, a rolling device 7 and a first lower hopper 9, and the legs 1. The top of the first box body 2 is connected by bolts. The bottom of the first box body 2 is connected with the first water outlet pipe 3 in the middle. The first water outlet pipe 3 communicates with the inside of the first box body 2. The bottom of the first box body 2 There is a sewage treatment device 5 below, and the sewage treatment device 5 includes a second box body 51, a second outlet pipe 52, a first valve 53, a mesh plate 54, a first spring 55, an electric reel 56 and a first pull wire 57 , there is a second box 51 between the two legs 1, the outer left side of the second box 51 is connected to the right side of the left side leg 1 by bolts, the outer right sid...
Embodiment 2
[0024] A construction site sewage efficient treatment equipment, such as Figure 1-3 As shown, it includes a leg 1, a first box body 2, a first outlet pipe 3, a first horizontal plate 4, a sewage treatment device 5, a sewage treatment mechanism 6, a rolling device 7 and a first lower hopper 9, and the legs 1. The top of the first box body 2 is connected by bolts. The bottom of the first box body 2 is connected with the first water outlet pipe 3 in the middle. The first water outlet pipe 3 communicates with the inside of the first box body 2. The bottom of the first box body 2 There is a sewage treatment device 5 below, and the sewage treatment device 5 includes a second box body 51, a second outlet pipe 52, a first valve 53, a mesh plate 54, a first spring 55, an electric reel 56 and a first pull wire 57 , there is a second box 51 between the two legs 1, the outer left side of the second box 51 is connected to the right side of the left side leg 1 by bolts, the outer right side ...
Embodiment 3
[0027] A construction site sewage efficient treatment equipment, such as Figure 1-3 As shown, it includes a leg 1, a first box body 2, a first outlet pipe 3, a first horizontal plate 4, a sewage treatment device 5, a sewage treatment mechanism 6, a rolling device 7 and a first lower hopper 9, and the legs 1. The top of the first box body 2 is connected by bolts. The bottom of the first box body 2 is connected with the first water outlet pipe 3 in the middle. The first water outlet pipe 3 communicates with the inside of the first box body 2. The bottom of the first box body 2 There is a sewage treatment device 5 below, and the sewage treatment device 5 includes a second box body 51, a second outlet pipe 52, a first valve 53, a mesh plate 54, a first spring 55, an electric reel 56 and a first pull wire 57 , there is a second box 51 between the two legs 1, the outer left side of the second box 51 is connected to the right side of the left side leg 1 by bolts, the outer right sid...