Construction method of bored pile in sand seam geology, application of chemical sludge dado to same, and pile foundation

A technology of bored piles and construction methods, which is applied to sheet pile walls, infrastructure engineering, construction, etc., can solve the problems of easily collapsed holes, broken drill tips or drill pipes, etc., so as to reduce breakage, ensure wall protection performance, Improve the effect of economic and social benefits

Inactive Publication Date: 2017-10-17
江苏燕宁工程科技集团有限公司
View PDF1 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The first object of the present invention is to provide a construction method for bored piles in sand layer geology, so as to improve the existing technology of hole collapse, drill tip or drill rod breakage in the construction process of sand layer geological bored piles question

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The embodiments of the present invention will be described in detail below in conjunction with the embodiments or examples, but those skilled in the art will understand that the following embodiments or examples are only for illustrating the present invention, and should not be regarded as limiting the scope of the present invention. Where specific conditions are not indicated in the implementation modes or examples, proceed according to conventional conditions or conditions suggested by the manufacturer. The reagents or instruments used were not indicated by the manufacturer, and they were all conventional products that could be purchased from the market.

[0024] The embodiment of the present invention provides a construction method for sand geological bored piles, including a hole forming step and a hole cleaning step; the hole forming step uses chemical mud to protect the wall, and the viscosity of the chemical mud is controlled at the beginning of drilling and durin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a bored pile in sand seam geology, application of chemical sludge dado to the same, and a pile foundation, and relates to the technical filed of building operations so that the problems that collapsing holes, broken drill points or drill stems are likely to happen in the existing bored pile in sand seam geology construction process can be improved. The construction method of the bored pile in sand seam geology can guarantee that the chemical sludge dado has fine effect protective shelter, prevent the collapsing holes, effectively cool drill bits and lubricate drilling tools, and reduce the problems of broken drill points or drill stems so that it is guaranteed that drilling work can go on smoothly. The application of the chemical sludge dado in the construction method of the bored pile in sand seam geology are also provided, so that construction progresses and construction quality are effectively ensured, construction risks are reduced, economic benefits and social benefits are significantly increased, and accordingly the chemical sludge dado is suitable for popularization and application. A pile foundation obtained through the method is also provided. The integrity of the foundation pile is tested by ultrasonic testing, which shows that the foundation pile is I-grade pile and has good construction quality.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method of sand layer geological bored piles, application of chemical mud retaining walls therein and pile foundations. Background technique [0002] With the continuous development of pile machinery for hole-forming operations, bored piles are widely used in foundation infrastructure projects such as high-rise buildings, highway bridges or large structures. Bored pile refers to a pile made by mechanically drilling a pile hole in the foundation soil at the project site, and pouring concrete into it (or first hanging a steel cage in the hole and then pouring concrete). Drilling methods include mud wall drilling and dry drilling. The construction process of the bored pile with mud wall protection includes measuring the pile position, laying the casing, preparing mud, forming holes, clearing holes, lowering the reinforcement cage and pouring concrete. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E02D27/12
CPCE02D5/38E02D27/12
Inventor 蔡水中刘念刘幸福王安格雷志刚周育彬时亮
Owner 江苏燕宁工程科技集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products