Mixing equipment for asphalt road maintenance
A road maintenance and mixing equipment technology, applied in the field of asphalt road maintenance, can solve the problems of poor mixing effect, difficulty in controlling the mixing curing agent, high labor intensity, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A mixing equipment for asphalt road maintenance, such as Figure 1-6 As shown, it includes a support leg 1, a stirring box 2, a discharge pipe 3, a valve 4, a material discharge control device 5 and a first stirring device 6, and the support leg 1 is vertically arranged symmetrically on the left and right, and the top of the support leg 1 is connected by bolts The mixing box 2 is installed in the same way, the middle of the bottom of the mixing box 2 is vertically connected with the discharge pipe 3, the discharge pipe 3 is connected with the inside of the stirring box 2, the valve 4 is connected to the discharge pipe 3, and the upper part of the mixing box 2 is provided with a lower A material control device 5, a first stirring device 6 is provided at the lower part of the stirring box 2, and a first through hole 11 is opened on the upper left side of the stirring box 2.
Embodiment 2
[0036] A mixing equipment for asphalt road maintenance, such as Figure 1-6 As shown, it includes a support leg 1, a stirring box 2, a discharge pipe 3, a valve 4, a material discharge control device 5 and a first stirring device 6, and the support leg 1 is vertically arranged symmetrically on the left and right, and the top of the support leg 1 is connected by bolts The mixing box 2 is installed in the same way, the middle of the bottom of the mixing box 2 is vertically connected with the discharge pipe 3, the discharge pipe 3 is connected with the inside of the stirring box 2, the valve 4 is connected to the discharge pipe 3, and the upper part of the mixing box 2 is provided with a lower A material control device 5, a first stirring device 6 is provided at the lower part of the stirring box 2, and a first through hole 11 is opened on the upper left side of the stirring box 2.
[0037] The blanking control device 5 includes a partition 51, a sealing ring 52, a first slide ra...
Embodiment 3
[0039] A mixing equipment for asphalt road maintenance, such as Figure 1-6 As shown, it includes a support leg 1, a stirring box 2, a discharge pipe 3, a valve 4, a material discharge control device 5 and a first stirring device 6, and the support leg 1 is vertically arranged symmetrically on the left and right, and the top of the support leg 1 is connected by bolts The mixing box 2 is installed in the same way, the middle of the bottom of the mixing box 2 is vertically connected with the discharge pipe 3, the discharge pipe 3 is connected with the inside of the stirring box 2, the valve 4 is connected to the discharge pipe 3, and the upper part of the mixing box 2 is provided with a lower A material control device 5, a first stirring device 6 is provided at the lower part of the stirring box 2, and a first through hole 11 is opened on the upper left side of the stirring box 2.
[0040] The blanking control device 5 includes a partition 51, a sealing ring 52, a first slide ra...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



