A Calculation Method of Flow Attenuation Value in Debris Flow Accumulation Area
A calculation method and accumulation area technology, which are applied in the field of calculation of the flow attenuation value in the debris flow accumulation area, can solve the problems of complex attenuation models, limitations, and many parameters involved, and achieve the effect of perfect calculation theory.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] The watershed of Xiongjiagou in Shilong Formation, Shilong Village, Huilong Township, Shimian County is fan-shaped, with a drainage area of 5.5km 2 . The highest point in the watershed is 2990m above sea level, the ditch mouth is 1185m above sea level, and the relative height difference is about 1805m. The overall terrain is high in the northeast and low in the southwest. The valley is deep and the terrain undulates greatly. The length of the Xiongjiagou valley is 4.05km, and the average longitudinal slope of the valley is 376‰. During the period from 17:00 on July 4th to 7:00 on July 5th, 2013, heavy rain fell in Shimian County, causing severe erosion of the upper reaches of Xiongjiagou, resulting in a large-scale debris flow disaster. The "7.04" Xiongjiagou debris flow once washed out about 5.5×10 solid matter 4 m 3, where 4.3×10 4 m 3 The solid matter silts up the Zhuma River, causing blockage of the Zhuma River, about 1.2×10 4 m 3 The mudslide material cro...
Embodiment 2
[0039] Mozigou is located in Yangdian Village, Wenchuan County, Sichuan Province. It is a tributary on the left bank of the upper reaches of the Minjiang River. The terrain of the Mozigou watershed is generally deep-cut structural erosion low mountains and middle mountains. Larger features, deep cut "V" shaped valleys. Mozigou drainage area is 7.4km 2 , the longitudinal length of the watershed is 4.8km, and the water system in the watershed is distributed in a dendritic shape. The highest point is located at the ridge on the northeast side of the watershed, with an elevation of 3208m. The vertical ratio is reduced by 434‰.
[0040] In order to effectively prevent and manage debris flow, and prevent the Minjiang River from being blocked and threatening downstream safety, effective predictions are made based on the characteristics of the debris flow channel and drainage channel design. The specific calculation methods and steps are as follows:
[0041] A. According to the fiel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com