Electric power system black-start recovered multi-target optimization method in consideration of comprehensive node weight
A multi-objective optimization and power system technology, applied in the field of multi-objective optimization of power system black start recovery, can solve problems such as power grid outages, system scale structure and complex control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] The present invention will be further described in detail below in conjunction with the accompanying drawings and through specific embodiments. The following embodiments are only descriptive, not restrictive, and cannot limit the protection scope of the present invention.
[0070] System recovery is to find an optimal solution at each time step under the condition of satisfying relevant constraints, and complete the recovery process of this time step. In order to speed up the process of system recovery, reduce the loss of social and economic benefits, and enhance the anti-interference of the newly formed network, this paper proposes three objective functions, namely, the comprehensive weight of nodes, the output of generators, and the anti-interference of the network.
[0071] The above three objective functions are calculated at each time step until all nodes recover or all units reach the rated output.
[0072] System recovery can be divided into a multi-period sequen...