A Parallel Implementation Method for Compiling and Reviewing Project Cost Documents
A technology for engineering projects and document preparation, applied in data processing applications, instruments, calculations, etc., can solve problems such as difficulty in ensuring cost document preparation and review quality, and achieve the effects of achieving reusability, shortening the design cycle, and ensuring working hours
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment approach
[0027] A parallel implementation method for preparation and review of construction project cost documents, comprising the following steps:
[0028] First, select the design quantity table and its template according to the engineering content of the project and the corresponding "Design Document Compilation Regulations or Measures";
[0029] Then, according to the project content and construction plan of the design quantity table and its template, establish the corresponding relationship between the sub-items and quota sub-items of the basic data of project cost document compilation and review, and the design quantity table and its template cell data;
[0030] When the specific quantity of the project design quantity table is determined, the cost analysis system or Excel tool will automatically generate the basic data table for the preparation and review of project cost documents;
[0031] Import the basic data sheets of all cost documents of the project into the cost analysis ...
example 1
[0041] Example 1: A parallel implementation method for the preparation and review of construction project cost documents, including the following detailed steps:
[0042] The first step is to formulate the design quantity form and its template for the preliminary design and construction drawing design of the highway engineering project.
[0043] "Methods for Compilation of Design Documents and Examples of Charts for Highway Engineering Capital Construction Projects" lists the contents and charts that should be designed for preliminary design and construction drawing design. Projects and facilities along the route, environmental protection and landscape design, other projects, road construction materials, construction schemes, design estimates or construction drawing budgets are organized and managed in twelve chapters and basic data. The overall content of the construction drawing design is:
[0044] (1) Determine the specific location of the route, that is, determine a unique...