[0089] A method for ecological restoration of an irregular high and steep rocky slope, comprising the following steps:
[0090] a. Clean up dangerous rocks on the slope;
[0091] During the excavation of rocky slopes, loose pumice is likely to be left on the slope surface, which must be cleaned in advance to prevent potential safety hazards caused by human disturbance during construction. Low slopes can be cleaned with high-pressure air guns, and high and steep slopes can be cleaned manually.
[0092] b. Measurement stakeout;
[0093] Mainly in combination with the current situation of the slope, the position of the bolt hole is reasonably arranged according to the specifications of the customized flexible protective net, and the holes are selected at the lower part of the slope as much as possible, and marked with spray paint;
[0094] c. Slope drilling;
[0095] The drilling distance is 450mm, and a pit with a depth not less than the length of the exposed ring sleeve of t...
Embodiment 2
[0114] A method for ecological restoration of an irregular high and steep rocky slope, comprising the following steps:
[0115] a. Clean up dangerous rocks on the slope;
[0116] During the excavation of rocky slopes, loose pumice is likely to be left on the slope surface, which must be cleaned in advance to prevent potential safety hazards caused by human disturbance during construction. Low slopes can be cleaned with high-pressure air guns, and high and steep slopes can be cleaned manually.
[0117] b. Measurement stakeout;
[0118] Mainly in combination with the current situation of the slope, the position of the bolt hole is reasonably arranged according to the specifications of the customized flexible protective net, and the holes are selected at the lower part of the slope as much as possible, and marked with spray paint;
[0119] c. Slope drilling;
[0120] The drilling distance is 550mm, and a pit with a depth not less than the length of the exposed ring sleeve of t...
Embodiment 3
[0139] A method for ecological restoration of an irregular high and steep rocky slope, comprising the following steps:
[0140] a. Clean up dangerous rocks on the slope;
[0141] During the excavation of rocky slopes, loose pumice is likely to be left on the slope surface, which must be cleaned in advance to prevent potential safety hazards caused by human disturbance during construction. Low slopes can be cleaned with high-pressure air guns, and high and steep slopes can be cleaned manually.
[0142] b. Measurement stakeout;
[0143] Mainly in combination with the current situation of the slope, the position of the bolt hole is reasonably arranged according to the specifications of the customized flexible protective net, and the holes are selected at the lower part of the slope as much as possible, and marked with spray paint;
[0144] c. Slope drilling;
[0145] The drilling distance is 500mm, and a pit with a depth not less than the length of the exposed ring sleeve of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com