Sequential collaborative simulation geological modeling method based on phase control
A geological modeling, sequential technique, applied in seismology for well logging, etc., can solve the problem of not considering sedimentary effects, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0043] Such as figure 1 As shown, it is a schematic flow chart of the geological modeling method based on phase control sequential collaborative simulation of the present invention. A method for geological modeling of sequential collaborative simulation based on phase control, characterized in that it comprises the following steps:
[0044] A. Obtain original well data, inverted or simulated data volumes and horizon data, build a facies model, set the number of random simulations, the number of interpolation layers, and find the number of points in the neighborhood of primary variables and seconda...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com