A technology of ejector rod and pin rod, which is applied in the direction of the device for maintaining the distance between parallel conductors, can solve the problems of unstable pulling force, unstable distance, high environmental requirements, etc., and achieve the effect of simple structure, reliable connection and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:
[0030] Such as figure 1 As shown, an auxiliary brace mechanism for pole construction includes: a main pole sleeve 1 , a moving pole sleeve 2 and a latch limit mechanism 6 .
[0031] The moving rod sleeve is inserted into the main rod sleeve. In this embodiment, the moving rod sleeve extends into the main rod sleeve from the port at the first end of the main rod sleeve. The first end of the moving rod sleeve is located outside the main rod sleeve, and the second end of the moving rod sleeve is located inside the main rod sleeve. The moving rod sleeve can slide along the axial direction of the main rod sleeve. The main rod sleeve and the moving rod sleeve are coaxially arranged, and the main rod sleeve and the moving rod sleeve are made of plastic material.
[0032] A trigger push rod 3 extending axially along the main rod sleeve is arranged in...