Wind electricity power prediction error evaluation method in consideration of load level and wind speed segments

A technology for wind power forecasting and load level, applied in forecasting, instrumentation, technical management, etc., and can solve problems such as impact

CN107832881AActive Publication Date: 2018-03-23ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD
7 Cites 10 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2018-03-23

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to a wind electricity power prediction error evaluation method in consideration of a load level and wind speed segments. The wind electricity power prediction error evaluation method in consideration of a load level and wind speed segments includes: performing data processing on a wind electricity power prediction result reported by a wind farm according to a set data processing method; calculating wind electricity power evaluation indexes according to the wind electricity power prediction result, wherein the wind electricity power evaluation indexes include an accuracy rate, a qualification rate, a reporting rate, a correlation coefficient, a load peak positive deviation rate, a load valley negative deviation rate, a high-speed segment prediction accuracy rate and low-speed segment prediction accuracy rate; according to the wind electricity power evaluation indexes and index weights corresponding to respective wind electricity power evaluation indexes, calculating a comprehensive evaluation parameter of the wind electricity power prediction result; and evaluating the wind electricity power prediction error of the wind farm according to the comprehensive evaluation parameter. The method can realize the comprehensive evaluation of the wind electricity power prediction result and improves corresponding evaluation accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of pre-control of electric power systems, in particular to a wind power prediction error evaluation method considering load level and wind speed segmentation. Background technique

[0002] With the rapid development of the global economy, the demand for energy continues to grow. At present, energy is facing practical problems such as resource depletion and serious pollution emissions. Wind energy, because it does not pollute the environment in the process of converting it into electrical energy, has abundant reserves, and has the lowest power generation cost. The characteristics of being close to conventional energy make it develop most rapidly. However, wind energy has the characteristics of volatility, intermittency and uncontrollability, which lead to random fluctuations in wind power output power (wind power of wind farms). With the increasing proportion of wind power generated by wind farms in the grid...

Examples

Embodiment Construction

[0015] The specific implementation of the wind power prediction error evaluation method considering the load level and wind speed segment of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0016] refer to figure 1 , figure 1 Shown is a flow chart of an embodiment of a method for evaluating wind power prediction errors considering load levels and wind speed segments, including the following steps:

[0017] S10, performing data processing on the wind power prediction results reported by the wind farm according to a set data processing method;

[0018] The above-mentioned wind power prediction results can be the actual power generation and predicted power generation corresponding to each time period (such as each minute) in a certain statistical cycle. The above-mentioned statistical cycle can also be called an evaluation period, and a certain length of the statistical cycle can be set. For example, it is set to Longer ti...