Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

37results about How to "Guaranteed optimization" patented technology

Metal cutting machining path planning system

PendingCN119126668Aimprove accuracyMeet physical characteristicsNumerical controlIndustrial engineeringImage acquisition
The invention relates to a metal cutting machining path planning system, and aims to optimize the efficiency and precision of a metal machining process through advanced technical means. The system comprises a plurality of functional modules: an image acquisition module captures a multi-angle high-resolution image of a to-be-processed metal workpiece; the three-dimensional reconstruction module reconstructs a three-dimensional model by using the images; the cutting simulation module simulates the three-dimensional model in a virtual environment and records stress and heat distribution conditions in the cutting process in real time; the intelligent segmentation module divides the machining process into a plurality of stages according to the stress and heat data; the comprehensive optimization module is combined with a genetic algorithm and a simulated annealing algorithm to optimize the cutting path, depth and feeding speed of each machining stage; the feedback adjusting module monitors stress and heat changes in actual machining, and when the stress and heat changes exceed threshold values, cutting parameters are automatically adjusted or machining is paused. According to the system, through comprehensive application of image processing, analog simulation and optimization algorithms, the cutting efficiency and the product quality are remarkably improved.
Owner:SHENZHEN LITTLE GIANT PRECISION MASCH CO LTD

Intelligent network connection vehicle anti-DoS attack fixed time optimal control method based on hierarchical structure

The invention provides an intelligent network connection vehicle anti-DoS attack fixed time optimal control method based on a hierarchical structure. The method comprises the following steps: step 1, constructing an intelligent network connection vehicle system model; the intelligent network connection vehicle system model comprises a leading vehicle and a following vehicle; step 2, designing a hierarchical optimal control method based on the intelligent networked vehicle dynamics model; and 3, triggering optimal control based on an event, and determining a weight vector approximate optimal control law by using an online algorithm based on reinforcement learning. According to the hierarchical cooperation optimal control method provided by the invention, the virtual reference layer determines the distributed elastic reference signal so as to ensure that the leader agent and the reference signal realize fixed time consistency under the condition of intermittent communication interruption caused by DoS attack, and the tracking control layer designs the optimal control strategy based on the reference signal and the event triggering mechanism, so that the optimal control effect is achieved. Reference signals are tracked in fixed time, and the overall performance of the system is optimized.
Owner:ARMY ENG UNIV OF PLA

Road sound insulation wall construction simulation system based on BIM

The invention relates to the technical field of construction simulation, in particular to a BIM (Building Information Modeling)-based highway sound insulation wall construction simulation system, which comprises a real-time data monitoring module, a resource demand prediction module, a resource optimization distribution module and a construction risk assessment module. The BIM technology is combined with real-time monitoring and historical data for analysis, the accuracy and efficiency of construction resource management are improved, resource allocation and demand prediction are more accurate, waste is directly reduced, the resource utilization efficiency is improved, the construction plan is dynamically adjusted to adapt to field changes, optimization of the construction progress and cost control is ensured, and the construction efficiency is improved. Through real-time identification and evaluation of risk factors, potential problems can be quickly responded, managers can be assisted to make countermeasures in advance, project risks are reduced, construction safety is ensured, flexibility of project management is enhanced, a decision process is effectively supported, and it is ensured that a construction project can be smoothly completed in a budget and time frame.
Owner:SHENZHEN CHENPU INFORMATION TECH CO LTD

Cross-regional energy supply and demand big data intelligent matching system

The invention relates to the technical field of energy supply and demand matching analysis, in particular to a cross-regional energy supply and demand big data intelligent matching system, which comprises the following modules: a data acquisition module which is responsible for collecting energy supply data and demand data of each region; the data processing module is used for cleaning, integrating and analyzing the collected data, and predicting future energy supply and demand conditions of each region by utilizing a machine learning algorithm; the intelligent matching module is used for intelligently matching an optimal energy supply and demand scheme according to an analysis result of the data processing module; the scheduling instruction module is used for sending a scheduling instruction to the energy management center of each region to realize cross-region allocation of energy; and the feedback adjustment module is used for collecting feedback information, adjusting algorithm parameters and optimizing a matching scheme according to an actual allocation effect. According to the invention, the optimization of energy distribution is ensured, and the loss and cost in the energy transmission process are reduced.
Owner:BAOYING COUNTY POWER SUPPLY BUREAU +2

Multi-energy complementary heating system for near-zero energy consumption building

The invention discloses a multi-energy complementary heating system for a near-zero energy consumption building, which relates to the technical field of building energy-saving equipment and comprises a microclimate regulation and energy optimization integration module, a multi-energy complementary heating system module, an intelligent control and execution module and a user interaction and feedback module, the microclimate adjustment and energy optimization integrated module monitors microclimate data of the surrounding environment of the building in real time through a high-precision sensor, and the microclimate adjustment and energy optimization integrated module monitors the microclimate data of the surrounding environment of the building in real time through the high-precision sensor; and factors having key influences on the heating effect are accurately extracted by utilizing a Pearson's correlation coefficient analysis algorithm and a neural network algorithm, and the system can dynamically calculate the optimal heating strategy and parameters based on the key factors, so that the operation efficiency of the heating system is remarkably improved, unnecessary energy waste is reduced, and the energy consumption is reduced. Therefore, a remarkable energy-saving effect is achieved.
Owner:CHINA SHANXI SIJIAN GRP

Intelligent optimization method and device for operation efficiency of unattended hydroelectric generating set

The invention relates to the technical field of power equipment operation and maintenance, provides an intelligent optimization method and device for the operation efficiency of an unattended hydroelectric generating set, and aims to improve the operation and maintenance efficiency and the management level of a hydropower station. A dual communication channel is established to ensure the stability of data transmission by acquiring the water-turbine generator set, the water level and the water flow data in real time. When the local unattended hydroelectric generating set operation control device cannot establish communication with the equipment, the cloud unattended hydroelectric generating set operation control device can be automatically switched to, and remote monitoring and control are achieved. Meanwhile, the system also has a data analysis and processing function, can timely discover abnormal conditions and send fault information to operation and maintenance personnel, and improves the fault processing efficiency. By introducing cloud backup data processing and a dual communication mechanism, the operation and maintenance reliability, safety and intelligent level of the hydropower station are remarkably improved, the manual intervention cost is reduced, and a powerful guarantee is provided for efficient and stable operation of the hydropower station.
Owner:HUANENG HUALIANGTING HYDROPOWER CO LTD

Multi-unmanned aerial vehicle cooperative power grid detection method and device

ActiveCN119624069Amultiple autonomyguaranteed optimizationData processing applicationsCircuit arrangementsSimulationUncrewed vehicle
The invention discloses a multi-unmanned-aerial-vehicle cooperative power grid detection method and device, and the method comprises the steps: building a multi-unmanned-aerial-vehicle cooperative task planning model based on the dynamic cost and dynamic income required by unmanned aerial vehicle detection considering environmental factors; based on the multi-unmanned aerial vehicle cooperative task planning model and the multi-unmanned aerial vehicle cooperative decision-making mechanism, nonlinear multi-target problem iterative optimization is carried out, and optimal task distribution of multi-unmanned aerial vehicle cooperative power grid detection is determined; and based on the optimal task allocation, coordinating the multiple unmanned aerial vehicles to perform power grid detection. The unmanned aerial vehicle can be endowed with more intelligence, and the task allocation planning resolving efficiency of multi-unmanned aerial vehicle cooperative power grid detection is improved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD TAIZHOU POWER SUPPLY BRANCH +1

Data transmission method based on Wifi-Direct network and related equipment

The invention relates to a data transmission method based on a Wifi-Direct network and related equipment, and the method comprises the following steps: carrying out the broadcast scanning of virtual receiving equipment supporting the Wifi-Direct network, and generating a virtual receiving equipment list; and analyzing a connection relationship between the virtual receiving device and the virtual bus device based on the list to obtain a network topology structure. And performing path planning on data transmission between the virtual receiving device and the virtual bus device by using the network topology structure to form a data transmission path. And carrying out bandwidth estimation on the data transmission path to obtain the available bandwidth of the link. And performing data transmission through the available bandwidth, performing transmission quality evaluation on a result, and generating a transmission quality evaluation report. If the evaluation result does not reach the preset quality grade, optimizing the data transmission path according to the report until the transmission result accords with the preset quality grade range; the technical problem that the data transmission quality between devices is difficult to guarantee is solved.
Owner:SHENZHEN HONGYUAN ZHITONG TECH CO LTD

A hyperbolic single crystal graphite neutron analyzer and preparation method thereof

The present invention relates to the technical field of neutron scattering, and in particular to a hyperbolic single crystal graphite analyzer used in a secondary spectrometer of a neutron spectrometer, which improves the energy resolution and detection efficiency of the neutron spectrometer by optimizing the geometric shape of the analyzer; the analyzer comprises a substrate, and both the horizontal (x) and vertical (y) directions of the substrate are designed into a hyperbolic trapezoidal structure according to a fourth-order polynomial, which determines the overall geometric shape of the analyzer; the present invention effectively solves the problems existing in the prior art through an innovative design of a hyperbolic single crystal graphite analyzer, significantly improves the performance of the neutron spectrometer, and has important value for neutron scattering research and applications in related fields.
Owner:INST OF HIGH ENERGY PHYSICS CHINESE ACAD OF SCI +1

Automatic opening and closing device for anti-floating hole of overflow weir of sedimentation tank

The utility model discloses a sedimentation tank overflow weir anti-floating hole automatic opening and closing device, and relates to the technical field of fluid control devices, the sedimentation tank overflow weir anti-floating hole automatic opening and closing device comprises a weir groove and an anti-floating hole automatic opening and closing valve, the anti-floating hole automatic opening and closing valve is mounted in the middle of one side of the weir groove, and the anti-floating hole automatic opening and closing valve comprises a mounting bottom plate for sedimentation tank fluid control and an anti-floating hole; according to the anti-floating sewage treatment device, the operation process is simplified through the physical and mechanical principle, the structure is simple, convenient and reliable, the maintenance cost is low, the operation efficiency of the sewage treatment process is greatly improved, in addition, all the components are made of anti-corrosion materials, and the anti-floating sewage treatment device is convenient to use and high in practicability. Compared with the prior art, the device has the advantages that the service life of the device is greatly prolonged, the long-term operation cost is reduced, and more importantly, the device ensures that the overflow weir can keep a stable operation state in different stages, ensures the quality of supernate, avoids the risk of hydraulic'short circuit 'and ensures the optimization of the sewage treatment effect.
Owner:JIANGXI HAIWEI WATER CONSERVANCY CONSTR CO LTD

Astaxanthin liposome-coating probiotic composite system based on interface free radical quenching and bidirectional coupling mechanism and application of astaxanthin liposome-coating probiotic composite system in oxidative stress protection

The invention discloses an astaxanthin liposome-coating probiotic compound system based on an interface free radical quenching and bidirectional coupling mechanism and application of the astaxanthin liposome-coating probiotic compound system in oxidative stress protection, and belongs to the technical field of biological medicines and probiotic preparations. According to the preparation method, probiotics with an iron ion mediated sodium alginate-guar gum coating are constructed, and the probiotics and astaxanthin nano-liposomes form an interface protection layer in a hydrogen peroxide stress microenvironment. Wherein astaxanthin protects the key enzyme activity of a thallus energy metabolism pathway, and the thallus continuously consumes a hydrogen peroxide substrate in the environment through an enzyme system of the thallus. According to the composite system disclosed by the invention, under the condition of no chemical coupling, synergistic enhancement of antioxidant defense and thallus activity can be realized through physical blending, the survival rate and colonization ability of probiotics in gastrointestinal stress are remarkably improved, and an innovative solution is provided for targeted intervention of inflammatory bowel diseases and development of functional probiotic preparations.
Owner:OCEAN UNIV OF CHINA

Intelligent biomass pyrolysis system controlled by neural network optimization algorithm

PendingCN119040021AGuaranteed type updatesguaranteed optimizationCoke oven safety devicesBiofuelsProcess engineeringBiogenic gas
According to the intelligent biomass pyrolysis system controlled by the neural network optimization algorithm, biomass raw materials are crushed and dried by arranging the feeding pretreatment device, so that the technical effects that the efficiency of the pyrolysis device in the biomass pyrolysis system is improved, and the power generation efficiency and the energy utilization rate are improved are achieved. By arranging the power generation device, biogas output by the cold cutting separation device is used for gas power generation, the obtained electric energy is preferentially supplied to the feeding pretreatment device, the pyrolysis device and the cold cutting separation device, the remaining electric energy is stored, and therefore self-sufficiency of energy utilization is achieved. The control equipment is arranged to predict the yield of biochar, bio-oil and biogas in a neural network calculation mode, and the feeding amount of the feeding pretreatment device and the adding rate and the heating temperature of the pyrolysis device are adjusted, so that the feeding amount, the heating rate and the temperature can be better controlled, more stable and predictable product distribution can be obtained, and the yield of the biochar, the bio-oil and the biogas is improved. And the self-sufficiency rate of energy can be further improved.
Owner:THE UNIV OF NOTTINGHAM NINGBO CHINA

Rice planting equipment with high enzyme activity and planting method thereof

The invention relates to the technical field of high-enzyme-activity rice planting data processing, and provides high-enzyme-activity rice planting equipment and a planting method thereof.The high-enzyme-activity rice planting equipment integrates a sensor network, a control device, a data acquisition terminal and an enzyme activity detection device, soil and environment parameters are acquired in real time, and the data of the soil and the environment are acquired; a planting strategy is optimized by using a data analysis algorithm, and the rice planting equipment with high enzyme activity can dynamically adjust the fertilization amount, the irrigation frequency and the planting density according to the rice growth condition, so that accurate management is realized. Seeding and fertilization are iteratively optimized through a genetic algorithm, so that the rice growth is close to expectation. Partition management and enzyme activity detection realize precise fertilization, optimize soil enzyme activity, improve rice yield and quality, reduce resource waste and environmental pollution, and effectively improve rice planting efficiency and benefits.
Owner:NANJING WANMEI JIANGNAN AGRI PROD CO LTD

Mesh division method and device for improving data availability

The invention discloses a grid division method and device for improving data availability. The method comprises the following steps: training a prediction model according to the population number and interest point data of a to-be-studied area to predict the population number of each first grid; the first grid is obtained by dividing the to-be-researched area according to a preset first grid size; searching an optimal unified offset through a first optimization strategy, and offsetting all the first grids according to the optimal unified offset, so that the number of the first grids of which the first population number is greater than or equal to a first threshold value is maximum; and searching an optimal merging scheme through a second optimization strategy, and merging the first grids according to the optimal merging scheme, so that the first population number of the merged first grids and the number of the first grids reach the minimum at the same time and are greater than or equal to the first threshold value. According to the method and the device, the number of grids can be reduced while the grid precision is improved, so that the subsequent data processing efficiency is improved.
Owner:广东省土地调查规划院

Medical inspection waste liquid treatment system

The invention relates to the technical field of inspection waste liquid treatment, in particular to a medical inspection waste liquid treatment system, which comprises an inspection waste liquid filter box, an image sensor and a filter assembly, the inspection waste liquid treatment box comprises a plurality of pH sensors, a switch controller and a stirring assembly; the central controller is used for receiving and analyzing a plurality of waste liquid images acquired by the image sensor, sending a filter screen adjusting instruction according to an analysis result, adjusting the filtering assembly according to the filter screen adjusting instruction, receiving and analyzing a plurality of real-time pH values acquired by the pH sensors, and sending an opening and closing instruction and a stirring adjusting instruction according to the analysis result; the switch controller is adjusted according to the opening and closing instruction, and the number of the stirring supporting rods is adjusted according to the stirring adjusting instruction. The stability of a medical examination waste liquid treatment result is improved.
Owner:TIANJIN AIDIKANG MEDICAL LAB CO LTD

Foundation pit structure construction method

The invention relates to a foundation pit structure construction method which comprises the following steps: step 1, a field manufacturing procedure: drilling an underground groove and manufacturing a reinforcement cage on site, then dynamically detecting the reinforcement cage by a detection mechanism, and meanwhile, installing a plurality of first sensors on the reinforcement cage by an installation mechanism; 2, a positioning and mounting procedure: after a detection mechanism dynamically detects and is matched with hoisting to adjust the mounting position of the first sensor, drilling a plurality of measuring holes in cooperation with a punching mechanism, and meanwhile, mounting a second sensor in each measuring hole in assistance of a mounting mechanism; and 3, a pouring pile-forming procedure is carried out, specifically, a punching mechanism supports deformation of the reinforcement cage to adjust stress, meanwhile, a mounting mechanism is assisted to mount a supporting cushion block to support the reinforcement cage to keep the stress, and under monitoring of a first sensor and a second sensor, the position and speed of cement pouring pile-forming are adjusted in real time. The problems that in the foundation pit construction process, manpower consumption is large, construction efficiency is low, the technology is unreasonable, and errors exist in monitoring data are solved.
Owner:HUZHOU CONSTR DESIGN RES INST

Horizontal moving device and horizontal moving method for large-tonnage gantry type rack

The invention relates to a horizontal moving device and method for a large-tonnage gantry type rack, and belongs to the technical field of gantry type racks. The horizontal moving device comprises a gantry state switching mechanism, a hydraulic system, a moving transmission mechanism and a gantry working platform; the portal frame state switching mechanism is arranged at the bottoms of stand columns of the gantry type rack and comprises jacking oil cylinders and rolling blocks, the rolling blocks are placed in through grooves in the bottoms of the stand columns and fall on a portal frame working platform below under the action of self weight, and idler wheels are arranged at the bottoms of the rolling blocks. The jacking oil cylinder is positioned above the rolling block; the hydraulic system controls the jacking oil cylinder to stretch out and draw back. The moving transmission mechanism is used for driving the gantry type rack to horizontally move on the gantry frame working platform; and the portal frame state switching mechanism is used for switching a stable supporting state and a rolling translation state of the gantry type rack. The horizontal moving method is carried out through the device, and the problems that in the prior art, a large-tonnage gantry type mechanical structure is difficult to move horizontally, and a moving platform is prone to being scratched are solved.
Owner:LUOYANG XIYUAN VEHICLE & POWER INSPECTION INST

A charging management method for electric vehicle

The present application discloses a method for managing electric vehicle charging, including: obtaining the multi-feature fusion vectors of each new energy power generation branch connected to the electric vehicle charging station and the current new energy power generation branch; inputting the multi-feature fusion vectors of each new energy power generation branch into the pre-trained stable supply prediction model corresponding to each new energy power generation branch, and outputting the stability index of each current new energy power generation branch; obtaining the power demand power of each charging pile to be worked in the charging station, the rated power generation power of each new energy power generation branch and its stability index, and determining the power supply object of the new energy power generation branch according to the preset power supply association algorithm. Thus, based on the multi-feature fusion vector, the stable supply prediction model of each new energy power generation branch is differentiated, and the power supply efficiency and the stability of charging management are improved.
Owner:ZHANGYE POWER SUPPLY COMPANY OF STATE GRID GANSU ELECTRIC POWER

Intelligent optimization design method and device for internal road of wind power plant, medium and product

The invention discloses a wind power plant internal road intelligent optimization design method, equipment, a medium and a product, and relates to the field of wind power plant road design. The method comprises the following steps: constructing a plurality of gradient grids on a map of a wind power plant based on DEM data of the wind power plant; configuring corresponding gradient cost for the gradient grid according to the gradient of the gradient grid; constructing a wind power facility road line selection model based on an improved A * algorithm and gradient cost; obtaining a path optimization result through the wind power facility road line selection model; determining an initial whale swarm of the whale swarm algorithm according to a path optimization result; obtaining the editing distance between the whale individuals and the fitness of each whale individual; judging whether a target whale exists or not according to the editing distance and the fitness; if not, performing field search on the whale individuals to obtain field whale; determining the optimized whale based on the fitness; and finally, determining an internal road optimization scheme of the wind power plant. According to the method, the wind power plant road design difficulty can be reduced, and the design scientificity and systematicness are improved.
Owner:XEMC WINDPOWER CO LTD

Water conservancy project patrol management and protection method and system

The invention is suitable for the technical field of water conservancy project informatization, and provides a water conservancy project patrol management and protection method and system, and the method comprises the steps: collecting shoreline parameter data, water area parameter data and reservoir surrounding environment data; preprocessing the shoreline parameter data, the water area parameter data and the reservoir surrounding environment data to obtain a shoreline feature data set, a water area feature data set and a reservoir surrounding environment feature data set, and performing weighted fusion on the shoreline feature data set, the water area feature data set and the reservoir surrounding environment feature data set to obtain a comprehensive feature data set; constructing a potential safety hazard prediction model, inputting the comprehensive feature data set into the potential safety hazard prediction model, and predicting to obtain a potential safety hazard coefficient of the water conservancy project; comparing the predicted potential safety hazard coefficient of the water conservancy project with a preset potential safety hazard coefficient threshold value of the water conservancy project, and judging whether the potential safety hazard exists in the water conservancy project or not; according to the invention, the inspection efficiency and accuracy are greatly improved, and problems can be found and solved in time.
Owner:ZHONGSHUI ZHIYU (TIANJIN) INFORMATION TECHNOLOGY DEVELOPMENT CO LTD

Biomechanical test equipment for multi-muscle coordinated movement of extraocular muscles and test method thereof

PendingCN119132165Aguaranteed optimizationimprove strabismusMeasurement devicesEducational modelsExtraocular musclesTherapeutic effectiveness
The invention belongs to the technical field of medical instruments, and particularly relates to biomechanical testing equipment for multi-muscle coordinated movement of extraocular muscles and a testing method thereof.The biomechanical testing equipment comprises an eyeball support, a fixing support, a traction motor, an angular velocity sensor and a force sensor; the eyeball support is used for placing eyeballs and rotates along with the eyeballs; the fixed bracket is movably connected with the eyeball support; the traction motor is connected with extraocular muscles of eyeballs through a traction rope; the angular velocity sensor is arranged on the eyeball support and used for measuring the rotation angle of the eyeball; the force sensor is arranged on the traction rope and used for measuring the force applied to extraocular muscles. Compared with the prior art, the defect that in the prior art, sufficient accuracy is still lacked in the aspects of extraocular muscle strength measurement and simulation and strabismus surgery effect prediction is overcome, the strength and movement of the extraocular muscle are measured and controlled through a more accurate and quantitative method, the implementation of the surgery is assisted, and the operation efficiency is improved. Therefore, the treatment effect of strabismus and other related eye diseases is finally improved.
Owner:SHANGHAI JIAOTONG UNIV

Baking process based on quality of Xiangyan No.7 fresh tobacco leaves

The invention relates to the technical field of tobacco baking, and provides a baking process based on the quality of fresh tobacco leaves of Xiangyan No.7. The baking process comprises the following steps: S1, carrying out near infrared spectrum scanning on harvested fresh tobacco leaves to obtain near infrared spectrum data of each tobacco leaf; s2, dividing the near infrared spectrum data into a training set and a test set; s3, taking the near infrared spectrum data of each tobacco leaf in the training set as an input vector, inputting the input vector into a self-organizing neural network model for clustering, and dividing the tobacco leaves into three subsets; s4, aiming at the three divided subsets, baking process parameters are optimized according to a three-section baking process, and the three-section baking process comprises a yellowing period, a color fixing period and a stem drying period; and S5, performing near infrared spectrum scanning on newly harvested tobacco leaves, classifying the newly harvested tobacco leaves through the self-organizing neural network model, determining subsets to which the newly harvested tobacco leaves belong, and according to the baking process curves corresponding to the subsets, sequentially executing the baking processes of a yellowing period, a color fixing period and a stem drying period.
Owner:CHANGDE COMPANY OF CHINA TOBACCO HUNAN

Circuit and method of implantable medical device in-vitro program control equipment

The invention belongs to the technical field of medical treatment, and discloses a circuit of an in-vitro program control device of an implantable medical instrument, which comprises an external program control device A1 and an implantable medical device C1, the external program control equipment A1 comprises seven parts, namely a coil group a1, a coil control module a2, a signal filtering and amplifying module a3, a data signal shaping module a4, an MCU (Microprogrammed Control Unit) main control module a5, an upper computer a6 and a feedback signal detection module a7. A plurality of coils of the in-vitro program control equipment are integrated into one coil, so that multiple types of implantable medical equipment adopting different in-vivo coil parameters only need to correspond to one in-vitro program control equipment, the in-vitro program control equipment is internally provided with the coils capable of switching different parameters, and the in-vitro program control equipment can be conveniently switched through simple switching. Therefore, the communication with various types of implantable medical devices can be realized, the maintenance convenience of the implantable medical devices is greatly improved, and the operation difficulty of patients and doctors is remarkably simplified.
Owner:SHAANXI QINMING MEDICAL CO LTD

A heavy metal treatment system for industrial wastewater

The invention relates to a method for treating heavy metals in industrial sewage applied to the field of sewage treatment. When mixed water flows along a sedimentation tank, heavy metals flocculate and fall into the bottom of the sedimentation tank. During the movement of a movable plate, a sludge pump is started to absorb floccules precipitated at the bottom of the sedimentation tank through a hollow frame and discharge the floccules to the inside of a collection tank. When the movable plate moves from one end of the sedimentation tank to the other end, the real-time power of the sludge pump is monitored by a power sensor. If the power of the sludge pump is high, it indicates that the amount of floccules is large, that is, too much reagent is added. If the power of the sludge pump is too low, it indicates that the amount of floccules is small, that is, insufficient reagent is added. According to the working power of the sludge pump, a sewage metering valve and a reagent metering valve are adjusted to control the discharge ratio of sewage and reagent, so that the sewage and the reagent can be mixed in a reasonable ratio, thereby avoiding the problem of poor sewage treatment effect or excessively high residual concentration of the reagent, and ensuring the optimization of the flocculation effect.
Owner:NANTONG BIGAO ENVIRONMENTAL ENG CO LTD

A Method and System for Elastic Resource Scheduling in Education Based on Microservice Orchestration

ActiveCN121724387BAvoid scheduling lagsAvoid rough regulationData processing applicationsBiological modelsEducational supportMicroservices
This invention discloses a method and system for flexible educational resource scheduling based on microservice orchestration, relating to the field of educational resource scheduling technology. This method acquires educational resource data (including educational support resource data and user behavior data) for a designated educational platform within a set period; analyzes the platform's resource elasticity feature set (including educational resource supply characteristic values ​​and educational demand intensity characteristic values) based on the platform's resource elasticity feature set; and analyzes the platform's educational resource adaptation characteristic values ​​based on the platform's resource elasticity feature set. This invention performs microservice orchestration resource scheduling on the designated educational platform based on the educational resource adaptation characteristic values, effectively avoiding resource scheduling lag and coarse control, thereby enabling the educational platform to maintain refined resource allocation under different load conditions.
Owner:ZHONGHUI YUNQI TECH GRP CO LTD +1

Flexible DC power grid multi-current-limiting equipment parameter optimization method based on current-limiting contribution degree cost allocation

The invention discloses a flexible DC power grid multi-current-limiting device parameter optimization method based on current-limiting contribution degree cost allocation, and the method comprises the steps: carrying out the equivalence of a flexible DC power grid according to the operation condition of an MMC before a fault, and obtaining a virtual far-end equivalent network; the FCL in the virtual far-end equivalent network is optimized; in order to optimize the current limiting equipment, the cost of FCL, CLR and DCCB is analyzed; constructing a target function of comprehensive cost effectiveness and fault current suppression of the current limiting device and the DCCB; and under the condition that constraints in the fault current limiting process are met, solving the target function to realize parameter optimization of the current limiting equipment. According to the invention, parameter optimization of the current limiting equipment can be carried out under the condition of ensuring economical efficiency optimization of the current limiting equipment and the DCCB, and the method is not limited by a topological structure of the current limiting equipment.
Owner:STATE GRID CHONGQING ELECTRIC POWER CO ELECTRIC POWER RES INST +1

AOD furnace high-temperature flue gas waste heat recycling device

The invention relates to the related technical field of AOD (Argon Oxygen Decarburization) furnaces, in particular to an AOD furnace high-temperature flue gas waste heat recycling device which comprises an AOD furnace, and a preheating device is arranged on the inner surface of a flue. According to the AOD furnace high-temperature flue gas waste heat recycling device, through the arrangement of the preheating device, when the preheating device works, high-temperature flue gas transmits heat to materials in an overhead stock bin through a flue and a heat exchanger pipe on a mounting plate, at the beginning, sliding blocks are located in sliding grooves, limiting blocks are located in clamping holes, and when adjustment or maintenance is conducted, external force enables the sliding blocks to move, and springs stretch out and draw back; during normal preheating, heat is transmitted to the heat exchanger pipe through the mounting plate, the heat is transmitted to materials through the pipe wall after the temperature of a heat exchange medium is increased, waste heat of the AOD furnace is utilized, the energy efficiency is improved, waste is reduced, the position of the heat exchanger pipe can be flexibly adjusted according to the actual situation through the adjustable mounting structure, and the heat exchange efficiency is improved. And it is ensured that the preheating effect is optimal.
Owner:ZHE JIANG YOU YI TE ZHONG GANG YOU XIAN GONG SI

A grid partitioning method and device for improving data availability

ActiveCN119004114BGuaranteed to be availablereasonable divisionOther databases indexingOther databases querying
The present application discloses a grid division method and device for improving data availability. The present application trains a prediction model based on the population of the area to be studied and the data of points of interest to predict the population of each first grid; the first grid is obtained by dividing the area to be studied according to a preset first grid size; the optimal unified offset is searched through a first optimization strategy, and all the first grids are offset according to the optimal unified offset, so that the number of first grids whose first population is greater than or equal to a first threshold is maximized; the optimal merging scheme is searched through a second optimization strategy, and the first grids are merged according to the optimal merging scheme, so that the first population of each first grid after merging and the number of first grids are both minimized and greater than or equal to the first threshold. Through the present application, the number of grids can be reduced while improving the grid accuracy, thereby improving the efficiency of subsequent data processing.
Owner:广东省土地调查规划院

Control system and method based on multi-point micro-injection of cervix uteri

The invention belongs to the technical field of cervix uteri micro-injection, and particularly relates to a control system and method based on cervix uteri multi-point micro-injection. Through three-dimensional image data and accurate calculation, the medicine dosage of each injection point can be adjusted according to specific requirements, it is ensured that medicine can accurately reach a lesion area, personalized medicine injection is carried out according to specific conditions and lesion degrees of cervical tissue, the pertinence and effect of treatment are improved, and the treatment cost is reduced. By means of injection distribution compensation and injection area compensation, uniform distribution of medicine in cervical tissue is guaranteed, the problem that local medicine is too much or too little is avoided, medicine dosage and distribution are accurately controlled, excessive accumulation of the medicine in a non-lesion area is reduced, the risk of side effects is reduced, and by comprehensively considering all compensation values, the accuracy of medicine injection is improved. The medicine dosage of each injection point is optimized, so that the overall treatment effect is improved.
Owner:TIANJIN CENT OBSTETRICS & GYNECOLOGY HOSPITAL