Provided is a high-pressure industrial
heat supply method for a thermal power
plant. Optimization design is conducted on a large
high pressure-
intermediate pressure combined cylinder
turbine generator set, and unconventional high-pressure industrial
heat supply extraction steam is provided for heat consumers. The method specifically includes the following steps that a
high pressure flow extractor 1 is shrunk to reach a high output flow area and an intermediate flow area, so that the pressure of the extractor 1 is about 10% higher than industrial
heat supply extraction
steam pressure when industrial heat supply steam is not extracted under a rated condition; consideration is given to reasonable feed-
water temperature and a minimal
pressure difference between the front and back of an intermediate regulating valve when heat supply extraction steam is rated; an industrial heat supply extraction steam opening is added to an extraction steam
pipe of the extractor 1, namely, regenerative extraction steam and industrial extraction steam of the set are located in the same extraction opening, and meanwhile, a fast closing adjusting valve and a
check valve are arranged on an industrial heat supply extraction steam pipeline; when loads of the heat consumers change, high output pressure is adjusted by changing the opening degree of the intermediate regulating valve, and therefore the pressure of the upstream separated extractor 1 is influenced and kept stable; the heat supply amount of the set is small, the extraction
steam pressure is in a naturally pressure rising state, the intermediate regulating valve does not act, and the heat supply extraction
steam pressure is kept stable through
pressure reduction by a regulating valve on the heat supply extraction steam pipeline.