Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Engineering project information management system and method

An information management system and technology for engineering projects, applied in payment system structure, data processing applications, instruments, etc., can solve problems such as information backlog, reduced management efficiency, and increased additional expenses, so as to improve final account efficiency, effective fund management, and reduce The effect of administrative costs

Inactive Publication Date: 2018-04-20
BEJING NEW AIRPORT CONSTR HEADQUARTERS
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the information management of large-scale engineering projects mainly relies on imported ERP software platforms. Although the platform parameters can be adjusted according to project requirements to suit different projects, the ability to integrate multiple key businesses of different engineering projects is limited, such as engineering budgets, contracts, Financial and material equipment, etc., especially for project final accounts, often need to be carried out after the completion of the project. A large amount of information backlog will lead to reduced management efficiency, delay in the final account process, and increase additional expenses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project information management system and method
  • Engineering project information management system and method
  • Engineering project information management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The principles and features of the present invention are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0020] Such as figure 1 As shown, an engineering project information management system provided by an embodiment of the present invention includes a contract management module, a cost estimation management module, a financial management module, and a materials and equipment management module.

[0021] The contract management module is used to manage basic contract information, list item information, change information and payment order information.

[0022] The cost estimate management module is used for defining the estimate classification and managing the estimate amount information.

[0023] The financial management module is used for voucher processing, accounting subject management, fixed asset management and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an engineering project information management system and method. The system includes a contract management module, a cost budgetary-estimate management module, a finance management module and a material and equipment management module. The contract management module is used for managing contract basic-information, bill item information, change information and payment billinformation. The cost budgetary-estimate management module is used for defining budgetary-estimate levels, and managing budgetary-estimate money amount information. The finance management module is used for voucher processing, accounting subject management, fixed-asset management and completion final-accounts. The material and equipment management module is used for managing material registrationinformation, equipment registration information and equipment checking and acceptance information. According to the technical solution provided by the invention, engineering budgetary-estimate, contract, cost and material management is effectively integrated, a completion final-account process can be routinized, management of an engineering project is standardized, and speed of the engineering completion final-accounts is increased.

Description

technical field [0001] The invention relates to the field of computer technology, in particular to an engineering project information management system and method. Background technique [0002] At present, the information management of large-scale engineering projects mainly relies on imported ERP software platforms. Although the platform parameters can be adjusted according to project requirements to suit different projects, the ability to integrate multiple key businesses of different engineering projects is limited, such as engineering budgets, contracts, Finance and material equipment, etc., especially for project final accounts, often need to be carried out after the completion of the project. A large amount of information backlog will lead to reduced management efficiency, delay in the final account process, and increase additional expenses. Contents of the invention [0003] In order to establish a set of key business processing requirements and unified engineering ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q20/10G06Q40/00
CPCG06Q10/06313G06Q10/103G06Q20/102G06Q40/125
Inventor 蔡颢李志勇张宏钧王海瑛李青蓝孙柱升
Owner BEJING NEW AIRPORT CONSTR HEADQUARTERS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products