Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

194 results about "Cost estimate" patented technology

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values.

Civil construction project cost evaluation optimization system

The invention relates to the technical field of cost assessment, in particular to a civil construction project cost assessment optimization system, which comprises a feature analysis module, a cost estimation module, a real-time monitoring module, a model training and tuning module, a risk analysis module, a decision support module, a financial simulation module and a reinforcement learning cost adjustment module. According to the invention, a convolutional neural network algorithm and a principal component analysis method in the feature analysis module excavate building information model data and screen key features, and the cost estimation module combines a multi-layer perceptron neural network and a linear regression model to enhance the cost mode analysis capability and calculate the project cost. The digital twinborn technology and the dynamic programming algorithm realize tracking of project progress and real-time monitoring of cost change in the real-time monitoring module, and the genetic algorithm and the machine learning algorithm realize continuous optimization and self-learning of model parameters in the model training and tuning module. And a Monte Carlo simulation method and a sensitivity analysis method are used for identifying and evaluating project risks in the risk analysis module.
Owner:WUHAN ZHIERXING ENGINEERING DESIGN CO LTD

Program, method, information processing device, and system

By automating everything from design drawing analysis to cost estimation, work efficiency is improved and highly accurate cost estimation is achieved. [Solution] The program is a program to be executed by a computer having a processor and a memory, and the program causes the processor to execute the following steps: accepting information about a design drawing; selecting a tool to be used by inputting a first prompt containing information about the design drawing and an instruction to execute the estimation process to a generation AI configured to execute an estimation process using a first tool and a second tool based on the information about the design drawing; when the first tool is selected, identifying an area included in the information about the design drawing using the first tool; and when the second tool is selected, calculating the quantity of components included in the identified area using the second tool.
Owner:KK GENERATION CO LTD

Low-altitude path planning method and system based on dynamic adaptive graph neural network

The invention discloses a low-altitude path planning method and system based on a dynamic adaptive graph neural network, and belongs to the technical field of artificial intelligence and robot autonomous navigation. Aiming at the problems of large calculation amount of a fixed grid map, slow dynamic response of a static octree, failure of a traditional heuristic function on a non-uniform graph and the like, the invention provides the following scheme: constructing a resolution self-adaptive non-uniform graph by using the octree; a Morton code is adopted to realize rapid positioning of a dynamic obstacle and millisecond-level updating of a map; an attention mechanism is introduced into a graph attention network (GAT), weights are adaptively allocated to different neighbor nodes, features are aggregated, and a high-precision heuristic cost estimation value is output; and finally, integrating the estimated value into an algorithm to perform efficient path search. According to the method, the memory occupation and the calculation complexity are remarkably reduced, and the planning efficiency and the path safety in a dynamic environment are improved.
Owner:CHINA TELECOM UNMANNED TECH (JIANGSU) CO LTD

Method and device for estimating cross-system query cost of heterogeneous database

The invention discloses a heterogeneous database cross-system query cost estimation method and device, and relates to the technical field of databases. Comprising the following steps: step 1, when a source database is in butt joint with a heterogeneous database system, selecting a query cost evaluation index: taking a calculation cost based on a calculation amount as the query cost evaluation index of the source database, and respectively taking rates in the processes of data introduction, calculation triggering and result transmission as the query cost evaluation index of the heterogeneous system; 2, establishing a cost estimation model according to the query cost evaluation indexes: establishing the cost estimation model by using the query cost evaluation indexes on the basis of database query and on the premise of executing aggregation and sorting calculation by the heterogeneous system; the heterogeneous query execution plan of the source database is sent to a heterogeneous system to be executed, a query cost evaluation index evaluation value and calculation timing are obtained to serve as feedback values, the feedback values are used for training the cost estimation model, and the cost estimation model is used for calculating the cost of the heterogeneous query execution plan.
Owner:上海沄熹科技有限公司

Manufacturing process optimization method and system based on multi-agent autonomous collaboration

The invention discloses a manufacturing process optimization method and system based on multi-agent autonomous collaboration, and the method is applied to a central coordinator, and comprises the steps: transmitting a received production demand to a task planning agent for the task planning agent to carry out the analysis and decomposition, and forming task information; receiving task information, wherein the task information comprises sub-tasks after the task planning intelligent agent analyzes and decomposes the production demand; the sub-tasks are sent to a plurality of intelligent agents, so that the intelligent agents perform bidding according to self capability evaluation functions and cost estimation to generate bidding information; and bidding information is received, the bidding information comprises a self-ability evaluation function and cost estimation of each agent for each sub-task, the sub-tasks are allocated to the multiple agents according to a total execution cost minimization principle, and a production plan is generated and executed. According to the method provided by the invention, planning and execution of the production task can be autonomously completed in a complex manufacturing scene, and the production efficiency and the product quality are improved.
Owner:武汉益模科技股份有限公司

Equipment maintenance system and equipment maintenance method

To compare the costs of both on-site maintenance services and remote maintenance services and to propose a maintenance method having a good cost-effectiveness.SOLUTION: An equipment maintenance system for determining a method for handling a failure of equipment is provided with: an asset knowledge database in which a failure and a failure cause of the equipment are registered; an input unit for accepting failure information output from the equipment; a failure cause estimating unit for referring to the asset knowledge database based on the failure information accepted by the input unit and estimating the failure cause; a handling method determining unit for determining a handling method for handling the failure cause estimated by the failure cause estimating unit; a cost estimating unit for estimating a cost, required for the handling method determined by the handling method determining unit, separately for a dispatch handling in which an engineer is dispatched to the scene where the equipment is installed and a remote handling in which an engineer handles the failure remotely; and an output unit for outputting the handling method having the smallest cost among the costs estimated by the cost estimating unit.SELECTED DRAWING: Figure 1
Owner:HITACHI IND EQUIP SYST CO LTD

Software function demand evaluation method and system based on function points, medium and equipment

The invention relates to a software function demand assessment method and system based on function points, a medium and equipment, and the method comprises the steps: decomposing to-be-assessed software into a plurality of function points according to an estimated function, so as to estimate the total function point number of the software; acquiring reference data through historical project data, estimating the workload of the software through the reference data and an estimation model according to the total function points, and introducing an adjustment factor to adjust the estimated value of the workload; a cost estimated value is determined through the estimated value of the workload, an accurate software project plan is made according to the cost estimated value and the estimated value of the workload, and the progress and quality of a project are monitored through measurement of function points. The invention relates to the technical field of software evaluation, and can effectively improve the accuracy of estimation.
Owner:CHINA SHENHUA INT CONSTR CO LTD

System and method for implementing application modernization and migration

The invention relates to computer-implemented systems and methods for implementing an application modernization and migration tool. The invention provides: initiating a discovery of current system specifics, wherein the discovery comprises business analysis and technical analysis; based on the discovery, developing a modernization plan that prioritizes and optimizes application and system migration, wherein the modernization plan considers risk analysis and cost estimation; designing a pathway and an architecture for the modernization plan; executing the pathway and implementing the architecture to initiate a modernize and migrate process for a target system wherein the modernize and migrate process comprises one or more of: infrastructure build, data migration, rebuild, rehost, re-platform, refactor and integrations, testing and delivery; and making available operation of the modernized and migrated target system.
Owner:KPMG LLP

Iterative multi-attribute index selection for large database systems

The inventors have implemented in a columnar in-memory database and studied access patterns of a large production enterprise system. To obtain accurate cost estimates for a configuration, the inventors have used the what-if capabilities of modern query optimizers. What-if calls, however, are the major bottleneck for most index selection approaches. Hence, a major constraint is to limit the number of what-if optimizer calls. And even though the inventive approach does not limit the index candidate set, it decreases the number of what-if calls because in each iteration step the number of possible (index) extensions is comparably small which results in a limited number of what-if calls.
Owner:HASSO PLATTNER INST FUR DIGITAL ENG GGMBH

Electricity consumption monitoring analysis method

The invention discloses a power consumption monitoring analysis method, which relates to the technical field of power data analysis, and comprises the following steps of: acquiring current monitored power consumption data by using a data acquisition module, substituting the power consumption data for calculation by using a data comprehensive processing module, and outputting to obtain a total power consumption value ZD, a power consumption efficiency value DX and a power consumption cost estimation value C; and based on the electricity consumption cost estimation value CG, analyzing the monitored electricity consumption condition by using a result analysis and feedback module, compiling an electricity consumption monitoring analysis report, and adjusting an electricity consumption strategy according to the analysis report. The method not only solves the problems of data singleness, lack of dynamic adjustment, one-sided efficiency evaluation and lack of comprehensive analysis ability in the prior art, but also provides powerful technical support and decision basis for energy management through accurate cost estimation and optimized efficiency evaluation.
Owner:WUXI MACHENG INFORMATION TECHNOLOGY CO LTD

Building engineering cost budget combination template

The utility model discloses a constructional engineering cost preliminary budget combination template, relates to the technical field of constructional engineering, and aims to solve the technical problem that the current constructional engineering cost preliminary budget combination template is inconvenient to quickly replace, the constructional engineering cost preliminary budget combination template comprises a fixed bracket, and a mounting plate is arranged on the fixed bracket. According to the utility model, the four groups of templates are arranged in the mounting plate, the four groups of templates are respectively the basic data entry area, the cost calculation area, the result display area and the related information supplement area, and then the quick fixing structures corresponding to the mounting rods on the templates are arranged on the back surface of the mounting plate, so that when the templates are mounted, the inserting rods of the quick fixing structures are pulled, and the templates can be quickly fixed. And at the moment, the spring is in a compressed state, then the template is placed in the placement groove of the mounting plate, the mounting rod of the template penetrates through the first through hole, and then the insertion rod is pushed to be quickly reset and inserted into the second through hole of the mounting rod under the action of the spring, so that quick mounting of the template can be realized.
Owner:裴晓强

Information software project cost evaluation system and method

The invention discloses an informatization software project cost evaluation system and method, and the system comprises a data collection module, a data processing module, a cost evaluation module and a result output module, and relates to the technical field of software project management. According to the informatization software project cost evaluation system and method, through cooperative work of the cost evaluation unit and the value evaluation unit of the cost evaluation module, a quantitative evaluation model is constructed based on historical data and market dynamics, accurate measurement and calculation of the whole life cycle cost of a software project are realized, and when the deviation analysis unit finds that the cost is abnormal, the evaluation result is accurate. And the data can be immediately fed back to the data processing module and the cost evaluation module for dynamic adjustment, so that a closed-loop management mechanism of estimation-evaluation-deviation correction is formed, the problem of disordered cost management is fundamentally solved, the cost is reduced, and meanwhile, reasonable allocation of resources and stability of software quality are ensured through matching analysis of the cost and the value.
Owner:SHANGHAI DIXIAO TECHNOLOGY CO LTD +1

Indoor assembly-oriented design parameter intelligent matching cost estimation method

The invention relates to the technical field of fabricated building cost estimation, and discloses an indoor fabricated design parameter intelligent matching cost estimation method. The method comprises the following steps: constructing a dynamic coupling fabricated component spatio-temporal evolution deduction network for bearing and simulating an interaction and transition process of design parameters in a complete assembly period; based on the network, spatio-temporal trajectory simulation is carried out on historical project data, and a component evolution path sequence containing cost correlation is generated. And establishing a semantic mapping channel from the evolution path sequence to the cost element, and analyzing the sequence into a structured cost influence factor map. And for a design scheme input in real time, the description of the design scheme is injected into the network for deduction, and a target component evolution path is obtained. And carrying out map matching and factor mapping on a target path by utilizing the cost influence factor map, and automatically outputting a refined cost estimation entry. According to the method, accurate and automatic estimation of the dynamic influence cost of the design parameters is realized.
Owner:ZHANGZHOU INST OF TECH

Equipment maintenance system and equipment maintenance method

PCT designated stage expiredWO2024252709A1ResourcesCommerceFailure causescomputer science
Proposed is a maintenance method for achieving high cost performance by comparing the cost of an on-site maintenance service with the cost of a remote maintenance service. This equipment maintenance system determines a response method for responding to a failure of equipment, the equipment maintenance system comprising: an asset knowledge database in which equipment failures and causes thereof are registered; an input unit that receives failure information output from the equipment; a failure cause estimation unit that estimates the cause of a failure, with reference to the asset knowledge database, on the basis of the failure information received by the input unit; a response method determination unit that determines a response method for responding to the cause of the failure estimated by the failure cause estimation unit; a cost estimation unit that estimates the cost required for the response method determined by the response method determination unit by separating the cost into the cost of an on-site response, in which an engineer visits the site where the equipment is installed, and the cost of a remote response, in which the engineer responds remotely; and an output unit that outputs the response method with the lowest cost among the costs estimated by the cost estimation unit.
Owner:HITACHI IND EQUIP SYST CO LTD

Building cost estimation method and device based on artificial intelligence, storage medium and electronic device

The invention discloses a building cost estimation method and device based on artificial intelligence, a storage medium and an electronic device. The method comprises the steps that a target drawing is acquired, and information in the target drawing is recognized and mapped to a standard layer; space planning is conducted on the target drawing, a target contour is determined based on the standard layer and the space planning scheme, and the target contour is used for cost measurement and calculation; calling an intelligent semantic recognition engine, analyzing product usage information in the target contour, classifying the primitives based on the spatial relationship and the product features, and determining a target primitive classification result; product processes are intelligently matched based on the target primitive classification result, the price library is called to calculate the target price for estimation list information, the target estimation building cost is determined, the estimation list information comprises the product processes and product usage information, and the technical problem that in the prior art, the building cost estimation efficiency is low is solved.
Owner:CHINA DESIGN DIGITAL TECH CO LTD

Artificial intelligence for sump pump monitoring and service provider notification

A computer system for sump pump monitoring and repair service provider notification may include one or more processors configured to: detect that a sump pump is faulty, transmit a prompt for service quotes to a machine learning (ML) chatbot to cause the ML chatbot to: request sump pump replacement or repair services from one or more service providers, receive cost estimates from the one or more repair service providers, receive schedule availability from the one or more repair service providers, receive, from the ML chatbot, the cost estimates and the schedule availability, and communicate the cost estimates and / or the schedule availability to a user associated with the sump pump.
Owner:STATE FARM MUTAL AUTOMOBILE INSURANCE COMPANY

SELECTIVE DATA COLLECTION FROM REMOTE DEVICES

A computer is programmed to determine a relationship between a confidence level and a cost estimate for collecting a data set from a plurality of remote devices, then receive an input selecting a confidence value for the confidence level and a cost estimate for the cost estimate, select an actual selection of the remote devices according to the confidence value, and transmit a request for the data set to the remote devices in the actual selection. The confidence level indicates a statistical confidence in the data set based on a candidate selection of the remote devices. The cost estimate indicates a cost for collecting the data set from the candidate selection of the remote devices. The confidence value and the cost estimate are consistent with the relationship between the confidence level and the cost estimate.
Owner:FORD GLOBAL TECH LLC

A pipeline layout management method and system based on data analysis

The present invention relates to the field related to engineering cost assessment, and discloses a pipeline layout management method and system based on data analysis. By collecting and evaluating environmental geological data and the environmental requirements for pipeline layout, the degree of transformation required for the corresponding environmental geology when pipelines are laid out in various locations in the assessment area is judged, and then the cost of pipeline layout can be estimated according to the unit cost of different environmental geological transformations, so as to determine the cost-optimal path for pipeline layout between points AB, and realize full-process cost planning and solution output.
Owner:LONG & CONSTR ENG CO LTD

Inspection and assessment based on mobile edge-computing

Methods, computer-readable media, software, and apparatuses may receive, at a field vehicle, field data from one or more unmanned autonomous vehicles, where the field data may be indicative of an item for assessment. Edge-computing, based on machine learning techniques, may be performed at the field vehicle to identify one or more characteristics of the assessment, and a projected cost may be determined. An estimate may be sent to a consumer. In some aspects, the projected costs may be based on local data related to a geographical location of the item. In another aspect, underwriting tasks may be performed at the field vehicle, and a quote may be sent to a consumer.
Owner:ALLSTATE INSURANCE COMPANY

Whole vehicle performance integration balance prediction method, model training method and system

The invention discloses a whole vehicle performance integration balance prediction method, system and device and a medium, and relates to the technical field of automobile engineering and artificial intelligence. The method comprises the following steps: acquiring a vehicle design parameter set containing structured feature data; inputting the data into a hybrid integrated AI agent model in parallel; using the first feature learning branch to extract decision tree path information as a first intermediate feature vector representing a structured rule; using a second feature learning branch to extract a full connection layer high-order semantic vector as a second intermediate feature vector representing the physical coupling relationship; carrying out weighted fusion on the two through a feature fusion network and carrying out multi-task prediction; and finally outputting a balance scheme including performance indexes and cost estimation. According to the method, the advantages of rule learning and nonlinear fitting are combined through a hybrid model architecture, traditional time-consuming simulation iteration is replaced, and rapid and accurate collaborative optimization of the whole vehicle performance and cost is achieved.
Owner:DONGFENG MOTOR GRP

Method, apparatus and system for encoding and decoding video data

A method of encoding video data into a video bitstream having a plurality of precincts. The method comprises generating a plurality of coding cost estimates (1106) for a current precinct of the plurality of precincts by testing a corresponding candidate coefficient truncation level for the current precinct, each of the coding cost estimates being an over estimate of an encoded data size for coding the current precinct at the candidate truncation level and being determined using a most significant bit plane index, wherein each of the coding cost estimates is independent of a value of coefficient bits in the current precinct. The method also comprises selecting (1110) one of the candidate truncation levels according to the corresponding coding cost estimate and a budgeted coding cost for the current precinct, the budgeted coding cost representing an allowable size of encoding the precinct; and encoding (1113) the current precinct of video data into the video bitstream using the selected truncation level to generate the video bitstream.
Owner:CANON KK

A bidding information display platform for engineering cost estimates

This utility model relates to the field of display stand technology, specifically a bidding information display stand for engineering cost estimates. The utility model includes a display stand body, and a statistical component is provided on the inner wall of the display stand body. The statistical component includes a statistical rod slidably connected to the inner wall of the display stand body. By setting up the statistical component, when it is necessary to count the number of times a bidding document has been read by visitors, after a visitor removes the bidding document, the statistical rod moves downwards due to its own weight, causing the receiving end of a photoelectric sensor to move downwards into the mounting slot, thereby receiving the signal light emitted by the transmitting end of the photoelectric sensor, and thus sending an electrical signal to the controller, causing the counter to increment by one. Then the visitor puts it back into the display stand body, and the counter increments again when the next visitor removes it for reading. The same method can be used to count the bidding documents in each compartment of the display stand body, thereby achieving the purpose of counting the number of times bidding documents have been read.
Owner:TIBET NATIONAL PROCUREMENT PROJECT CONSULTING CO LTD

Building material cost estimation method and system, terminal and storage medium

The invention relates to a building material cost estimation method and system, a terminal and a storage medium, and relates to the technical field of building material cost estimation, and the method comprises the steps: collecting a specific construction position and a project construction drawing of a preset underground parking lot; searching a matched parking lot set in a preset regional project library according to the specific construction position and a preset matching condition; analyzing the matched parking lot set and the project construction drawing to determine matched parking lots, project matching areas and project unmatching areas; analyzing the matched parking lot and the matched project area to determine the building material cost of the matched area; performing BIM modeling and cost estimation on the project unmatched area to determine the building material cost of the unmatched area; and determining the project building material cost of the underground parking lot according to the building material cost of the matched area and the building material cost of the unmatched area. The method has the effect of improving the estimation efficiency of the building material cost.
Owner:HANGZHOU CHANNEL CLOUD DIGITAL INTELLIGENCE TECHNOLOGY CO LTD

Estimation program, estimation method, and information processing apparatus

To provide a low-cost method for estimating conditions under which a memory capacity shortage of a node can be suppressed when causing the plurality of nodes to execute processing of a problem.SOLUTION: A control unit multiplies the number of first processes per node in the case of executing the process of a target problem B1 by a predetermined number to calculate the number of second processes per node in the case of executing the process of an evaluation problem B2 which is smaller in a computational amount than the target problem B1 on a small number of nodes; allows, assuming that the number of second processes is constant, executing the process of the evaluation problem B2 under respective conditions under which each of the size of the evaluation problem B2 and the number of nodes executing the process of the evaluation problem B2 is increased stepwise at the same rate; calculates an approximate curve of the relationship between the size of the evaluation problem B2 and the memory usage per node under each condition; and estimates the number of nodes executing the process of the target problem B1 and the size of the target problem B1 based on the approximate curve, the amount of memory usage per node when an error occurs due to insufficient memory capacity, and the predetermined number.SELECTED DRAWING: Figure 12
Owner:FUJITSU LTD

Query plan generation method and device, electronic equipment and storage medium

The invention discloses a query plan generation method and device, electronic equipment and a storage medium. A predicted resource consumption value of a structured query language is generated based on historical query according to a meta-learning model in a query optimizer, and at least one execution plan is generated according to physical query optimization; obtaining a first execution plan, calculating a first resource consumption value of the first execution plan, and calculating a first comparison similarity between the first resource consumption value and the predicted resource consumption value; and after determining that the first comparison similarity is greater than or equal to a preset similarity threshold, determining the first execution plan as a target execution plan. A structured query language is estimated based on historical query through a preposed meta-learning model to obtain a predicted resource consumption value, and similarity calculation is performed on the predicted resource consumption value and the resource consumption value of the generated execution plan to determine a final target execution plan, so that the cost estimation number of the execution plan is reduced, and the efficiency of the execution plan is improved. The output speed of the final execution plan is accelerated, and the calculation overhead is reduced.
Owner:CHINA MOBILE (SUZHOU) SOFTWARE TECH CO LTD +1

System for predicting industrial property cost

To more accurately predict industrial property costs.SOLUTION: A cost prediction system includes: a reading unit that reads occurred and incomplete events that have already occurred but are incomplete at a time point of when the prediction is executed; a first prediction unit that predicts costs and cost occurrence timing relating to the occurred and incomplete events; a second prediction unit that predicts costs and cost occurrence timing relating to non-occurred events that are expected to occur after the time point of when the prediction is executed; a counting unit that counts the costs predicted to be incurred for a cost prediction target industrial property right in units of a predetermined period based on the predictions of the first prediction unit and the second prediction unit; and an output unit that outputs the costs counted in units of the predetermined period.SELECTED DRAWING: Figure 1
Owner:NGB 가부시키가이샤

A smart generation system for optimizing engineering cost list quotas

This invention discloses an intelligent generation system for optimizing quota-based cost estimates in engineering projects, relating to the field of engineering cost estimation technology. The invention includes: a process action atom library construction module, used to decompose quota items into multiple process action atoms, and to label each process action atom with a cost driving factor and the function type of the cost driving factor. By constructing a process action atom library and a cost driving factor system, this invention achieves refined decomposition of quota items, laying a data foundation for conversion based on the essence of the process; it introduces a process knowledge graph to store the process logic and cost transmission relationship, enabling the system to have process reasoning capabilities, making the conversion process more consistent with engineering reality; the intelligent conversion engine executes differentiated nonlinear conversion rules based on cost driving factors, solving the systematic deviation caused by the traditional linear scaling "one-size-fits-all" approach, and effectively improving cost estimation accuracy.
Owner:CHENGDU TOKEN BEAT TECHNOLOGY CO LTD

Methods for Flood Control Operation of Multi-hole Reservoirs under Multiple Rounds of Heavy Rainfall

A method for flood control scheduling of multi-hole reservoirs under multiple rounds of heavy rainfall includes the following steps: S1: Perform independent simulations for m from 1 to M, generating a single sample path, dynamically scheduling, and calculating the total cost. S2: Calculate the expected total cost estimate, average operating cost, average risk cost, and scheduling failure probability. S3: Execute flood control scheduling for the multi-hole reservoir based on the optimal threshold group that minimizes the expected total cost. This invention treats each round of effective heavy rainfall during the plum rain season as a random "impact" on the reservoir flood control system, and characterizes the reservoir flood control scheduling process as a multi-stage dynamic decision-making process consisting of an initial operation stage and several tiered flood discharge stages. Considering the comprehensive costs of downstream evacuation, flood disturbance, and power generation losses caused by tiered flood discharge, the optimal scheduling under risk-cost trade-offs is constructed.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

system

Provide a system. 【Solution means】 A device for automatically aggregating information from public information sources, A device for processing the aggregated information to identify a project target, A device for creating optimized proposed content by referring to past history data, A device for automatically calculating a cost estimate, A device for automatically creating materials for a proposal, A device for improving the proposed content by learning evaluations from users, A device for visually checking and modifying the proposed content using a mobile terminal or an information display device, A system including.
Owner:SOFTBANK GROUP CORP