The invention relates to the technical field of
engineering cost supervision, and discloses a process execution supervision
system and method suitable for an
engineering cost consultation project. According to the method, a project full-cycle
data set is acquired through a distributed
data acquisition interface, wherein the
data set at least comprises a contract file and a progress
payment voucher; performing structured feature analysis on the
data set to generate a multi-dimensional item
feature matrix including time nodes, cost indexes and
resource allocation quantities; calling a pre-constructed project cost reference parameter
library, and calculating a real-
time deviation degree between the multi-dimensional project
feature matrix and the reference parameters based on a
dynamic time warping algorithm; when the real-
time deviation degree exceeds a preset threshold range, automatically triggering a process
abnormality recognition engine, and extracting process feature vectors including a construction period
delay rate, a cost hyperbranched rate and a material
loss rate from the deviation process; and inputting the process
feature vector into a pre-trained compliance
verification model, and outputting an
abnormality diagnosis report including a violation type, a
risk level and a responsibility subject.