Pad stone and pre-buried bolt hole forming device synchronously constructed with bridge pier caps
A technology of synchronous construction and pre-embedded bolts, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of affecting the construction period, low construction efficiency, and high construction costs, so as to improve labor productivity, avoid rework and repair, The effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] A pad stone and pre-embedded bolt hole forming device that is constructed simultaneously with the bridge pier cap, such as Figure 1 to Figure 3 As shown, it includes: pier top hat template 1, angle steel 2, support pad stone template 3, adjustable angle steel 4, rubber tube 5, material inlet 6, adjustable bolt 7, adjustable bolt 8, adjustable bolt 9, fixed Steel plate 10, angle steel backing plate 11, wherein:
[0012] The pier cap template 1 and the fixed steel plate 10 are welded into a whole, the fixed steel plate 10 is connected with the left and right two angle steels 2 through adjustable bolts 7, the left and right angle steels 2 are connected with the supporting pad stone formwork 3 by welding, and the supporting pad stone formwork 3 is connected with the adjustable angle steel 4 through the adjustable bolt 9, and the angle steel backing plate 11 is fixedly arranged on the adjustable angle steel 4, and the rubber tube 5 is arranged on the angle steel backing pla...