Irregular foundation pit supporting structure and construction method
A technology of foundation pit support and construction method, which is applied in basic structure engineering, excavation, construction, etc., can solve the problem of insufficient support strength, and achieve the effects of shortening construction period, high safety performance, and high support strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Embodiment one: if figure 1 , 2 As shown, an irregular foundation pit support structure includes a cement support wall 1 arranged around the foundation pit, and a plurality of cement support walls 1 are evenly pierced on the cement support wall 1 to tighten the cement support wall 1 on the side wall of the foundation pit. The tension anchor 2, the cement support wall 1 includes several support units 11 connected in sequence.
[0044]The cement support wall 1 can prevent the foundation pit from collapsing during excavation and use to a certain extent, ensure the safety of the underground structure construction and the surrounding environment of the foundation pit, and effectively prevent the buildings around the foundation pit from tilting. The connecting columns 112 are fastened together two by two during use, so it is not easy to be partially tilted when subjected to external force during use. In use, because the cement support wall 1 is tightened by the tension ancho...
Embodiment 2
[0050] Embodiment 2: A construction method for an irregular foundation pit support structure, comprising the following construction steps:
[0051] S1. According to the construction drawing, measure and set the construction contour line of the cement mixing pile on site, and draw the contour line with white ash;
[0052] S2. Place the cement mixing pile machine used for construction at the place where construction is required, and lay steel plates and road substrates under the cement mixing pile machine, then move the cement mixing pile machine, check the positioning after the movement, and correct any deviations in time , the pile position deviation is not greater than 50mm, the cement mixing pile machine should be stable and straight in place, and observe with theodolite or wire hammer to ensure the verticality of the drill bit of the cement mixing pile machine;
[0053] S3, on-site stirring to prepare cement slurry;
[0054] S4, start the cement mixing pile machine, drill ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com