Pile head concrete construction and chiseling-removing method
A concrete and pile head technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of affecting the holding force of concrete, large labor consumption, inability to clean, etc. Low cost and the effect of eliminating the cleaning process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0026] The following describes the present invention further, but the protection scope of the present invention is not limited to this:
[0027] The method for constructing and removing pile head concrete of the present invention. Before the pile head construction, a hollow pipe is placed on the anchoring bar end of the pile head reinforcement cage, and the pile head reinforcement cage of the hollow pipe is placed, and then the concrete is poured. The concrete in the anchoring area and the anchoring bars of the steel cage are separated by hollow pipes, which cannot form a binding force. After pouring is completed, dig the pile head foundation pit and use a pneumatic pick to drill holes in the pile head to cause cracks in the concrete. It can be quickly divided into pieces and fall off. The hollow tube in the embodiment of the present invention uses a pearl cotton hollow foam tube. The length of the foam tube is 2m / piece. The specific specifications can be customized or directly tw...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com