Cylindrical shear brace connecting structure for precast pier and precast plate

A technology for connecting structures and plate tubes, which is applied to bridge parts, bridges, buildings, etc., can solve the problems of prefabrication and installation of prefabricated concrete components, difficulty in aligning connectors, lack of theoretical breakthroughs, and many temporary facilities. Connect, reduce on-site workload, and eliminate the effect of many temporary facilities

Pending Publication Date: 2018-06-05
ANHUI TRANSPORTATION HLDG GRP CO LTD
View PDF12 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

After years of exploration, although this technology has been greatly developed and the demonstration effect is good, there are still many shortcomings: such as insufficient large-scale construction, absence of key structures, lagging control structure and lack of theoretical breakthroughs
[0003] The fast and efficient connection between precast concrete components has always been a difficult problem in domestic design and construction, especially for precast concrete components of different shapes: using traditional cast-in-place connection methods, there are many temporary facilities, and the workload is too large; using traditional dry joints or glue Connection methods such as joints need to be used in conjunction with various connectors, and prefabrication and installation deviations of precast concrete components often make the alignment of connectors very difficult, making prefabrication and construction difficult, reducing the advantages of industrial construction, and difficult to connect. ensure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cylindrical shear brace connecting structure for precast pier and precast plate
  • Cylindrical shear brace connecting structure for precast pier and precast plate
  • Cylindrical shear brace connecting structure for precast pier and precast plate

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] Such as figure 1 , in order to adapt to the development requirements of standardization, systematization, modularization and assembly in the industrial construction of green roads, a new type of prefabricated beam-slab pavement is designed and proposed. Tubular prefabricated concrete piers 4 with an outer diameter of 600mm and an inner diameter of 380mm are arranged. How to quickly connect the prefabricated piers and slabs on the construction site is a difficult problem in design and construction.

[0037] Such as figure 2 , image 3 , Figure 4 , the design specifically proposes a prefabricated pier, plate-tube shear brace connection structure,

[0038] The precast concrete beam slab 1 is provided with a vertically through bolt hole 2, and the top of the precast concrete pier 4 is provided with a pier top cavity 5, and the precast concrete beam slab 1 and the precast concrete pier 4 are connected by cylindrical shear braces 6 and The bolt 3 is connected, and the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a cylindrical shear brace connecting structure for a precast pier and a precast plate. According to the connecting structure, the precast concrete beam plate and the precast concrete pier are connected through a cylindrical shear brace and connecting bolts; the lower end of the cylindrical shear brace is arranged in a pier top cavity and is composed of a backing board, a porous cylinder and a flange plate in a welding mode; the backing board and the flange plate are arranged in parallel; the porous cylinder is welded between the backing board and the flange plate; theflange plate is arranged parallel to the precast concrete beam plate; the connecting bolts penetrate through bolt holes; the upper ends of the connecting bolts are anchored to the top of the precast concrete beam plate, and the lower ends of the connecting bolts are anchored to the flange plate; and after the bolt holes and the periphery of the cylindrical shear brace are plugged, concrete is poured, so that the precast pier and the precast plate can be quickly connected. Compared with the prior art, the connecting structure has the advantages that connecting construction is simplified, the on-site workload is greatly reduced, quick construction site connection of precast concrete members of a factory is realized, and the development of a highway industrial construction technology is promoted.

Description

technical field [0001] The invention belongs to the technical field of civil engineering, and in particular relates to a connection structure of prefabricated piers and plate-tube shear braces. Background technique [0002] At present, adopting a structural point of view and an industrialized model to implement the construction of less soil, no soil, high efficiency, and low-cost projects at the level of scale and serialization is becoming the development direction of my country's green road construction. Among them, the complete set of technology for small and medium-sized structures is a key part of the implementation of green road construction and road industrialization. After years of exploration, although this technology has been greatly developed and the demonstration effect is good, there are still many shortcomings: such as insufficient large-scale construction, absence of key structures, lagging control structures, and lack of theoretical breakthroughs. [0003] Th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/00E01D19/02
CPCE01D19/00E01D19/02
Inventor 胡可郑建中曹光伦王凯于春江吴建民吴平平杨大海魏民朱军
Owner ANHUI TRANSPORTATION HLDG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products