Semi-reversed underground structure for underground road and construction method thereof
A technology for underground structures and underground roads, applied to underwater structures, infrastructure engineering, artificial islands, etc., can solve problems such as difficult, impossible to cover soil for greening, water leakage in expansion joints, etc., to achieve easy construction, simple construction, and convenient maintenance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Depend on figure 1 and figure 2 As shown, a kind of semi-reversed underground structure for underground road of the present invention comprises roof 1, enclosure pile 3, base plate 4, column pile 5, side wall 6, reinforced concrete column 7 and section steel column 8, described The two ends of the roof 1 are provided with end supports 101, and the middle is provided with a middle support 102. The enclosure piles 3 are arranged at the bottom of the roof 1, and the enclosure piles 3 are fixedly connected to the end supports 101. The reinforced concrete column 7 is arranged at the bottom of the roof 1, and the reinforced concrete column 7 is fixedly connected to the middle support 102, and the inside of the reinforced concrete column 7 is provided with a steel column 8; the bottom of the reinforced concrete column 7 Insert into upright stake 5.
[0024] The ends of both sides below the top plate 1 are reserved for connecting steel bars.
[0025] The profiled steel colu...
Embodiment 2
[0030] A kind of construction method of the semi-reversed underground structure that is used for underground road of the present invention, comprises the following steps:
[0031] (1) Excavating from the ground to the excavation surface 9 for the first time, the first excavation surface 9 is arranged below the bottom surface of the roof 1;
[0032] (2) Construct enclosure piles 3 at 9 places of the first excavation surface;
[0033] (3) install column pile 5 and reinforced concrete column 7 at the excavation place;
[0034] (4) On the excavation surface 9 for the first time, the roof slab 1 is poured in vertical form;
[0035] (5) After the roof 1 reaches the design strength, the formwork is removed, and the earth-covering structure 2 is laid on the top of the roof 1, and the municipal pipeline is laid at the same time, and the road construction is completed;
[0036] (6) Excavate the earth from the outside to the inside and from top to bottom under the top plate 1, and exca...