Telegraph pole displacement and upright equipment for city buildings
A utility pole and building technology, applied in the field of utility pole displacement and erection equipment, can solve the problems of inaccurate and stable installation position of utility poles, time-consuming and labor-intensive, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] A pole displacement and erection device for urban buildings, such as Figure 1-8 As shown, it includes a mounting frame 1, a first support seat 2, a wheel shaft 3, a tire 4, a first slide rail 5, a first slider 6, a support plate 7, a fixed plate 8, a connecting rod 9, and an electric reel 10. , the second support seat 11, the first rotating shaft 12, the rotating block 13, the first connecting plate 14, the first screw rod 15, the pressing plate 16, the supporting plate 17, the first nut 19, the first connecting block 20 and the steel wire rope 21, the mounting frame 1 The first support base 2 is installed on the left, right, front and rear sides of the lower side by welding, the outer side of the first support base 2 is rotatably connected to the wheel shaft 3, the wheel shaft 3 is connected to the tire 4, and the upper side of the mounting frame 1 passes through The first sliding rail 5 is installed in the way of bolt connection, and the first sliding block 6 is slid...
Embodiment 2
[0039] A pole displacement and erection device for urban buildings, such as Figure 1-8 As shown, it includes a mounting frame 1, a first support seat 2, a wheel shaft 3, a tire 4, a first slide rail 5, a first slider 6, a support plate 7, a fixed plate 8, a connecting rod 9, and an electric reel 10. , the second support seat 11, the first rotating shaft 12, the rotating block 13, the first connecting plate 14, the first screw rod 15, the pressing plate 16, the supporting plate 17, the first nut 19, the first connecting block 20 and the steel wire rope 21, the mounting frame 1 The first support base 2 is installed on the left, right, front and rear sides of the lower side by welding, the outer side of the first support base 2 is rotatably connected to the wheel shaft 3, the wheel shaft 3 is connected to the tire 4, and the upper side of the mounting frame 1 passes through The first sliding rail 5 is installed in the way of bolt connection, and the first sliding block 6 is slid...
Embodiment 3
[0042] A pole displacement and erection device for urban buildings, such as Figure 1-8As shown, it includes a mounting frame 1, a first support seat 2, a wheel shaft 3, a tire 4, a first slide rail 5, a first slider 6, a support plate 7, a fixed plate 8, a connecting rod 9, and an electric reel 10. , the second support seat 11, the first rotating shaft 12, the rotating block 13, the first connecting plate 14, the first screw rod 15, the pressing plate 16, the supporting plate 17, the first nut 19, the first connecting block 20 and the steel wire rope 21, the mounting frame 1 The first support base 2 is installed on the left, right, front and rear sides of the lower side by welding, the outer side of the first support base 2 is rotatably connected to the wheel shaft 3, the wheel shaft 3 is connected to the tire 4, and the upper side of the mounting frame 1 passes through The first sliding rail 5 is installed in the way of bolt connection, and the first sliding block 6 is slida...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com