Combined construction method of grouting material and concrete at the bottom of embedded parts
A construction method and grouting material technology, which can be used in infrastructure engineering, construction, etc., and can solve problems such as lack of filling quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] The combined construction method of grouting material and concrete at the bottom of the embedded part is used for grouting construction at the bottom of the plate embedded part. Before the grouting material is poured, a plurality of grouting holes are set on the plate embedded part, and the grouting holes all penetrate the plate For embedded parts, the grouting holes are arranged sequentially from one side of the plate embedded part to the other side, and the one side and the other side are a pair of opposite sides;
[0032] The grouting hole is used as a channel for pouring grouting material to the bottom of the plate embedded part;
[0033] Grouting with grouting holes is carried out in the following ways:
[0034] The grouting material is poured within one hour to two hours after concrete pouring;
[0035] The grouting material is poured from one side of the plate embedded part to the other side, and the grouting material is poured into the space at the bottom of th...
Embodiment 2
[0040] This embodiment is further limited on the basis of Example 1: in order to further facilitate the flow of the grouting material at the bottom of the plate embedded part and obtain a larger grouting area, before the grouting material is poured, a plurality of Vent holes, the vent holes all go through the plate embedded part, and the vent holes are arranged in sequence from one side of the plate embedded part to the other side, and the vent holes are used as the bottom air of the plate embedded part to overflow outward channel;
[0041] There are vent holes between two adjacent grouting holes;
[0042] Vents are provided on both sides of the line connecting two adjacent grouting holes. In this scheme, the exhaust holes provided between the two adjacent grouting holes are not limited to the corresponding exhaust holes being located on the line connecting the corresponding two grouting holes; This situation is: the vent hole between two adjacent grouting holes is: the proj...
Embodiment 3
[0054] On the basis of Example 1, this embodiment provides a specific grouting material pouring construction method: before grouting, set up on the plate embedded parts The holes serve as vents and open The holes are used as grouting holes, and the grouting holes are arranged sequentially from north to south on the plate embedded parts. Cut notches on the plate embedded parts and the reinforcement ribs at the bottom of the plate embedded parts to facilitate the flow of grouting materials. An operating platform is set up on the upper part of the plate embedded parts. DN50 grouting pipes are installed below, and the high head difference and grouting material self-flowing method are used to facilitate the grouting from north to south --- if the numbers of grouting holes from north to south are 1, 2, 3, ... Grout through the No. 1 grouting hole, and then carry out the No. 2 grouting hole grouting, and then carry out the No. 3 grouting hole grouting, and complete the grouting of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com