An installation process and box technology, which is applied to the on-site preparation of building components, formwork/formwork/work frame, construction, etc., can solve the problem of the lack of tight sealing of the holes around the box, prone to honeycomb pitting, and box feeling. It can improve the visual quality, save materials and manpower, and prevent the phenomenon of honeycomb pitting.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A process for installing a box on a masonry wall, comprising the following steps:
[0020] (1) Determine the square steel, and determine the specification of the square steel according to the thickness of the decorative surface, so as to ensure that the pre-embedded box is flush and beautiful with the finished decorative surface;
[0021] (2) Make the frame attached to the box body, and firmly weld the square steel determined in step (1) according to the frame size of the pre-embedded box body to ensure the levelness of the frame surface, and the inner frame matches the pre-embedded box body, so as to Ensure that the pre-embedded box does not shake after nesting;
[0022] (3) Reserve the hole for treatment. According to the size of the pre-embedded box, the hole to be embedded should be chiseled and wetted, and a gap of 20mm should be maintained between the hole and the box to ensure that the hole is sealed tightly;
[0023] (4) The height of the bottom of the box is d...
Embodiment 2
[0031] A process for installing a box on a masonry wall, comprising the following steps:
[0032] (1) Determine the square steel, and determine the specification of the square steel according to the thickness of the decorative surface, so as to ensure that the pre-embedded box is flush and beautiful with the finished decorative surface;
[0033] (2) Make the frame attached to the box body, and firmly weld the square steel determined in step (1) according to the frame size of the pre-embedded box body to ensure the levelness of the frame surface, and the inner frame matches the pre-embedded box body, so as to Ensure that the pre-embedded box does not shake after nesting;
[0034] (3) Reserving the hole for treatment, according to the size of the pre-embedded box, the hole to be embedded is chiseled and wetted, and a gap of 50mm is maintained between the hole and the box to ensure that the hole is sealed tightly;
[0035] (4) The height of the bottom of the box is determined, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com