A construction method for pavement water stabilization layer and ancillary works
A construction method and water-stabilized layer technology, applied in the field of road construction, can solve problems such as uncompact construction, inability to eliminate pollution, and long construction period, so as to improve image and construction progress, facilitate thickness inspection and control, good integrity and The effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Such as figure 1 , figure 2 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:
[0039] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;
[0040] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;
[0041] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;
[0042] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the center of the road, respectively, to form two strips of road shoulder strip foundation 3 and...
Embodiment 2
[0049] Such as image 3 , Figure 4 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:
[0050] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;
[0051] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;
[0052] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;
[0053] S31. subbase construction, carry out pavement subbase 5 paving construction;
[0054] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the cente...
PUM
![No PUM](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com