Construction method of diversion tunnel plugging of hydropower station based on karst landform

A construction method and technology of diversion tunnels, which are applied in hydropower stations, hydropower generation, water conservancy projects, etc., can solve the problems of narrow construction surface and difficult sealing, and achieve high safety, low construction cost and short construction period. Effect

Active Publication Date: 2020-05-12
中国能源建设集团广西水电工程局有限公司
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The water in the diversion tunnel is deep and fast, the construction surface is narrow, and there are major safety hazards in the plugging. At the same time, there are many construction problems such as material transportation, temporary drainage, concrete pouring, and the stability of the plug structure. The plugging is extremely difficult.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of diversion tunnel plugging of hydropower station based on karst landform
  • Construction method of diversion tunnel plugging of hydropower station based on karst landform
  • Construction method of diversion tunnel plugging of hydropower station based on karst landform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0061] Embodiments of the present invention will be further described below in conjunction with the accompanying drawings.

[0062] see Figure 1-3 , a construction method for plugging diversion tunnels of hydropower stations based on karst landforms, which includes the following steps:

[0063] S1: Design diversion tunnel plugging scheme

[0064] Facing the severe situation of prominent safety hazards in diversion tunnel closure, short construction period, and difficult construction, after in-depth analysis of the overall stability of the diversion tunnel and the change law of flow and velocity in the tunnel, the "clogging in the tunnel is the main, Based on the principle of supplementary anti-seepage outside the tunnel, it was decided to adopt the plugging scheme of temporary plug plus permanent plug. Temporary plug is the most critical part of the entire plugging work, and the construction plan of temporary plug is focused on. The temporary plug section is located at the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a construction method for plugging diversion tunnels of hydropower stations based on karst landforms, which includes the following steps: S1: Designing a diversion tunnel plugging scheme, formulating the principle of mainly blocking inside the tunnel and supplemented by anti-seepage outside the tunnel, The plugging scheme of temporary plug and permanent plug; S2: Temporary plug construction of diversion tunnel: S21: Construction of construction channel and scaffolding platform; S22: Installation of water-retaining steel plate gate; S23: Installation of stacked beam door; S24 : Make and install the drainage steel pipe; S25: Pour the concrete of the first section of the temporary plug; S26: grouting plugging and reinforcement of the first section of the temporary plug; S27: Close the butterfly valve; S28: Pour the concrete of the second section of the temporary plug ; S3: Construction of permanent plug. By adopting the above-mentioned construction method for blocking the diversion tunnel of the hydropower station, the blocking of the diversion tunnel can be effectively ensured, thereby ensuring the safety of the dam.

Description

technical field [0001] The invention belongs to the technical field of hydraulic engineering construction, and in particular relates to a construction method for plugging diversion tunnels of hydropower stations based on karst landforms. Background technique [0002] The dam site of the Wanjiakouzi Hydropower Station is located on the Gexiang River in the upper reaches of the main stream of the Beipan River. It is the fourth level of hydropower development on the main stream of the Beipan River. The scale of the project is large (2), mainly for power generation. The main buildings are: rolling Concrete arch dam, dam crest overflow surface hole, energy dissipation pad pond, dam body flushing sand hole, water diversion system, ground powerhouse and switch station, etc. [0003] The normal storage level of the reservoir is 1450 m, the dam crest elevation is 1452.50 m, and the maximum dam height is 167.5 m. It is the highest RCC hyperbolic arch dam currently under construction. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02B9/02E02B7/20
CPCE02B7/20E02B9/02Y02E10/20Y02P70/50
Inventor 卢山龙利秋黄树鹏罗雄兵班辉周定强黄均华叶纯信蒙飞花
Owner 中国能源建设集团广西水电工程局有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products