Embodiment 1
[0059] (1) Test and promotion area: Huaquan Town, Chengdu;
[0060] (2) Time: April 2014 - April 2017;
[0061] (3) Planting crops: wheat and jade rotation (wheat, corn rotation);
[0062] (4) Fertilization program:
[0063] Blank control, conventional chemical fertilizer, livestock and poultry manure and chemical fertilizer fertilization and embodiment 1 are a total of 3 treatment schemes, each treatment is set up 3 parallel, a total of 12 randomly arranged plots. The area of the plot is 30m 2 , Build soil ditches between the plots with a depth of 20cm.
[0064] ①Manually screen and remove gravel with a larger diameter in the soil of the reclaimed land, and the diameter of the gravel in the reclaimed land shall not exceed 40mm;
[0065] ② Use a pulverizer to pulverize the fungus residue until the particle length does not exceed 30mm;
[0066] ③Before 6 days before sowing in the big spring and small spring, the fungus residue (3500kg / hm in the big spring 2 , small spri...
Embodiment 2
[0088] (1) Test and promotion area: Dayi County, Chengdu;
[0089] (2) Time: November 2014 - September 2017;
[0090] (3) Planting crops: wheat and jade rotation (wheat, corn rotation);
[0091] (4) Fertilization program:
[0092] Each treatment set up 3 parallel, a total of 15 randomly arranged plots. The area of the plot is 21m 2 , Build soil ditches between the plots with a depth of 20cm.
[0093] ①Manually screen and remove gravel with a larger diameter in the soil of the reclaimed land, and the diameter of the gravel in the reclaimed land shall not exceed 40mm;
[0094] ② Use a pulverizer to pulverize the fungus residue until the particle length does not exceed 30mm;
[0095] ③Before 6 days before sowing in the big spring and small spring, the fungus residue (3500kg / hm in the big spring 2 , small spring 3000kg / hm 2 ) spread on the soil, and mix with 0-25cm soil with a rotary tiller;
[0096] ④ 1 day before sowing in big spring and small spring, apply inorganic f...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 