Coral sand concrete pavement structure and construction method thereof
A technology of concrete pavement and construction method, which is applied to the coagulation pavement, roads, roads and other directions of on-site paving, can solve the problems of lack of fresh water in construction, and achieve the effects of low transportation cost, good deformation resistance, and good thermal insulation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] A construction method for a coral sand concrete pavement structure, comprising a cushion course (1), a subbase course (2), a base course (3), an anti-cracking course (4) and a surface course (5) laid sequentially on a soil foundation from bottom to top )(refer to figure 1 ), the specific operation steps are as follows:
[0045] Step 1: According to the design requirements of JTG D40-2011 "Code for Design of Highway Cement Concrete Pavement", excavate the subgrade or road cutting, clean up the surface of the soil base, such as weeds, Coke bottles and other garbage, and then level and compact it. The compaction degree should be greater than 95%.
[0046] Step 2, laying the cushion (1): Use natural coral sand, first use a road roller to compact the coral sand, because the coral sand will be slightly broken, so the road roller should be pressed 1-2 times more than normal to lay evenly Flat, laying thickness of 150mm, compaction degree greater than 95%; among them, under n...
Embodiment 2
[0052]A construction method for a coral sand concrete pavement structure, comprising a cushion course (1), a subbase course (2), a base course (3), an anti-cracking course (4) and a surface course (5) laid sequentially on a soil foundation from bottom to top ), the specific operation steps are as follows:
[0053] Step 1: According to the design requirements of JTG D40-2011 "Code for Design of Highway Cement Concrete Pavement", excavate the subgrade or road cutting, clean up the surface of the soil base, such as weeds, Coke bottles and other garbage, and then level and compact it. The compaction degree should be greater than 95%.
[0054] Step 2, laying the cushion (1): Use natural coral sand, first use a road roller to compact the coral sand, because the coral sand will be slightly broken, so the road roller should be pressed 1-2 times more than normal to lay evenly Flat, laying thickness of 100mm, compaction degree greater than 95%; of which, under normal circumstances, it ...
Embodiment 3
[0060] A construction method for a coral sand concrete pavement structure, comprising a cushion course (1), a subbase course (2), a base course (3), an anti-cracking course (4) and a surface course (5) laid sequentially on a soil foundation from bottom to top ), the specific operation steps are as follows:
[0061] Step 1: According to the design requirements of JTG D40-2011 "Code for Design of Highway Cement Concrete Pavement", excavate the subgrade or road cutting, clean up the surface of the soil base, such as weeds, Coke bottles and other garbage, and then level and compact it. The compaction degree should be greater than 95%.
[0062] Step 2, laying the cushion (1): Use natural coral sand, first use a road roller to compact the coral sand, because the coral sand will be slightly broken, so the road roller should be pressed 1-2 times more than normal to lay evenly Flat, laying thickness of 125mm, compaction greater than 95%; of which, under normal circumstances, it needs ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 