Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of a red mud fly ash geopolymer pile with a heatable pile body

A technology of geopolymer and construction method, which is applied in the construction of red mud fly ash geopolymer piles and the field of construction piles, can solve the problems of less projects and in the laboratory stage, and achieve the effect of ensuring the quality of the pile body

Active Publication Date: 2020-09-01
HEBEI CONSTR & INVESTIGATION RES INST
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the limitation of technical process, most of the research work is still in the laboratory stage, and it is rarely used in engineering.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The following examples serve to illustrate the invention.

[0026] A construction method of a red mud fly ash geopolymer pile whose pile body can be heated is completed through the following steps:

[0027] 1. Pile material preparation

[0028] The raw materials used include undisturbed red mud (RM) from an aluminum plant in Shandong, primary fly ash (F1) from a power plant, 5 mol / L alkali solution (NaOH solution) and river sand. Air-dry until the water content is 30%-35%, and pass through a 0.3mm-0.6mm round hole sieve. According to the results of indoor test and trial preparation, according to the mass ratio of red mud: fly ash: sand: alkali solution = 1:1:2: (0.8-1), add the mixer and stir for 5 to 10 minutes, and adjust the alkali appropriately according to the actual mixing situation The dosage of the solution ensures the reliable workability of the pile material, and the slump is controlled at 160-200mm;

[0029] 2. Drilling

[0030] According to the survey da...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a red mud fly ash geological polymer pile whose pile body can be heated. It includes the following steps: (1) Conduct indoor pile material ratio test according to the pile construction technology; (2) Drilling; select the drilling process according to the design size of the pile body and ground conditions; (3) Fabricate the heating device for the pile body; (4) ) pouring pile materials; (5) placing heating devices; (6) heating the pile body; (7) natural curing until the predetermined age, taking cores from the pile body, and testing the strength of the RFP pile body. The present invention aims at piles with red mud-fly ash (RFP) piles. By placing a heating device on the pile body, the on-site heating of RFP piles is realized, and the strength of red mud fly ash geopolymers is rapidly generated, effectively ensuring RFP pile quality. The invention can consume a large amount of red mud, provides a feasible method for the construction of red mud fly ash geological polymer piles, and provides a new idea for resource utilization of red mud.

Description

technical field [0001] The invention relates to a construction method of a construction pile, in particular to a construction method of a red mud fly ash geological polymer pile whose pile body can be heated, and belongs to the technical fields of waste comprehensive utilization and civil engineering. Background technique [0002] Red mud is a reddish-brown powder mud-like water-containing strong alkaline solid waste produced in the process of preparing alumina. For every 1 ton of alumina produced, 0.8-1.5 tons of dry red mud will be produced at the same time. At present, according to incomplete statistics, the comprehensive utilization rate of red mud in my country is very low, only 4%, and the accumulated reserves have reached hundreds of millions of tons. At present, a large amount of red mud mainly relies on large-area storage yards, which takes up a lot of land and causes serious pollution to the environment. It is imperative to minimize the harm of red mud and realize...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/38E02D15/04
CPCE02D5/38E02D15/04
Inventor 聂庆科韩立君李华伟梁书奇王英辉贾向新于俊超秦禄盛
Owner HEBEI CONSTR & INVESTIGATION RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products