A construction method and technology of box girder, applied in bridges, bridge construction, bridge materials, etc., can solve problems such as safety accidents, appearance defects of concrete at the bottom of beams, and long construction period.
Active Publication Date: 2021-09-14
ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE
View PDF8 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0004] 2. Long construction period: cast-in-place continuous box girder needs a series of processes such as steel bar binding, formwork erection, concrete pouring, etc.
[0005] 3. The problem of construction quality control is serious: the quality control of cast-in-place continuous box girder is a difficult problem in the construction process. If it is not handled properly, many problems will arise, such as cracks caused by concrete drying shrinkage, steel strand breakage and Slipping wire phenomenon and appearance defects of concrete at the bottom of the beam, etc., serious safety accidents caused by formwork and support system
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0037] see Figure 1-9, a new multi-chamber continuous UHPC box girder bridge superstructure construction method, its structure includes UHPC prefabricated longitudinal block center girder 1, UHPC prefabricated longitudinal block side beam 2 and prefabricated steel connector 4; the UHPC prefabricated longitudinal block The block center beam 1 and the UHPC prefabricated longitudinal block side beam 2 constitute the main beam 14 of the simply supported system. ...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses a novel multi-chamber continuous UHPC box girder bridge superstructure construction method, including UHPC prefabricated longitudinal block beam, UHPC prefabricated longitudinal block side beam, cast-in-place UHPC joint, prefabricated steel connector, shear force Nails, pre-embedded steel backing plates, pre-embedded bolts, temporary supports, permanent supports, stiffened beams, cast-in-place UHPC bottom plates, cast-in-place UHPC webs, cast-in-place UHPC roofs and thickened areas, simply supported system girders, stiffeners Beam floor, main beam web. The beneficial effect of the present invention is: the multi-chamber UHPC box girder is prefabricated in longitudinal blocks, assembled and connected on site through special connectors, and several multi-chamber simply supported box girders are first formed, and then passed on the pier by special The pouring method makes the box girder structure change from simply supported to continuous. The structural quality is excellent, the splicing is reliable, the mechanical performance and durability are good, the construction is convenient, the construction period can be greatly shortened, and the space under the bridge can be saved, which is very suitable for the needs of construction and development.
Description
technical field [0001] The invention relates to a construction method of a box girder bridge, in particular to a novel multi-chamber continuous UHPC box girder bridge superstructure construction method, and belongs to the technical field of connection structure and construction of a main girder at a bridge pier and a prefabricated beam. Background technique [0002] In urban bridges, prestressed concrete continuous wide box girder bridges are often used in the construction of urban bridges due to their excellent mechanical performance, good integrity, and beautiful appearance. However, due to the large overall volume and heavy overall weight of the wide box girder, prefabricated hoisting cannot be carried out for construction. At present, the construction method of on-site pouring is mainly used, and only a small part of the narrow box girder is constructed through prefabricated assembly. However, with the rapid development of the city, the urban traffic network is becoming ...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.
Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D2/04
CPCE01D2/04E01D21/00E01D2101/268
Inventor 李巍霍文斌王健张阳胡智敏饶欣频陈伟黄龙田梁茂平李炼
Owner ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE