Calculation method for deep and shallow buried critical depth of tunnel with small clear distance
A critical depth and calculation method technology, applied in the field of tunnel surrounding rock, can solve problems such as inapplicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0087] Beijing-Shanghai Expressway Jinan Link Project The Changshuiquan two-way eight-lane tunnel has a single tunnel length of 3,100 meters, an excavation span of 17.608 meters, and an excavation height of 11.161 meters. The tunnel passes through III, IV and V-level surrounding rocks. Line project control engineering.
[0088] Table 2 Selected cross-section parameters
[0089]
[0090]
[0091] The K4+700 section of the Class III surrounding rock with a small clear distance (buried depth of about 40m and clear distance of about 16m) was selected for analysis, and the physical and mechanical parameters related to the surrounding rock were selected according to Table 5. According to the judgment formula of the critical clearance distance, it can be seen that this section belongs to the case of no influence, and it can be seen from Table 4 that λ′ 2 = 0.1289. According to the corresponding equations, the critical depth of shallow burial of this section is 17.7338m, and t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 