Quick-mixing construction method based on prefabrication and assembly of superposed type underground utility tunnel

A technology of prefabricated assembly and integrated pipe gallery, which is applied in infrastructure engineering, artificial islands, water conservancy projects, etc., can solve the problems of high assembly machinery requirements, large sections of prefabricated pipe gallery, and difficult construction, etc., so as to reduce on-site humidity. The effect of operation and formwork operation, reducing the comprehensive cost of the project and facilitating transportation

Inactive Publication Date: 2018-11-06
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the overall cast-in-place method is adopted, usually due to a large number of steel bars, formwork and concrete pouring projects on site, the construction is difficult, the construction period is long, and the construction cost is high; when the prefabricated assembly method is adopted, usually due to the Large, causing inconvenience in transportation, and at the same time, higher requirements for assembly machinery, resulting in greater difficulty in construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Quick-mixing construction method based on prefabrication and assembly of superposed type underground utility tunnel
  • Quick-mixing construction method based on prefabrication and assembly of superposed type underground utility tunnel
  • Quick-mixing construction method based on prefabrication and assembly of superposed type underground utility tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the teachings of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.

[0027] Such as Figure 1-4 As shown, the embodiment of the present invention relates to a rapid mixed construction method based on prefabricated and assembled superimposed underground comprehensive pipe gallery, and the specific steps are as follows:

[0028] (a) According to the structural characteristics of the underground comprehensive pipe gallery and the conditions of the construction site, the pipe gallery is divided int...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to quick-mixing construction method based on prefabrication and assembly of a superposed type underground utility tunnel. The quick quick-mixing construction method based on prefabrication and assembly of the superposed type underground utility tunnel comprises the steps of zoning and segmenting an overall underground utility tunnel; excavating a foundation pit of the tunnel,and carrying out waterproof construction on a base layer and a bottom part; assembling prefabricated and assembled sections, and meanwhile, constructing reinforcing steel bars on cast-in-situ segments and carrying out template engineering construction; pouring and maintaining concrete; carrying out waterproof engineering construction; constructing a next zone: sequentially accomplishing the majorstructure construction of other tunnels in assembly zones according to the steps; and backfilling: backfilling the accepted tunnel structures until accomplishing the construction of the whole tunnel.According to the quick construction method, the underground utility tunnel is flow-process constructed in a zoning and segmenting way, each zone is divided into multiple flow-process operation areas, each flow-process operation area is further divided into a cast-in-situ segment and a prefabricated and assembled segment, and the advantages of the cast-in-situ construction technology and the prefabricated and assembled type construction technology are fully combined, so that the aim of effectively utilizing the construction operation surface for quick construction is achieved.

Description

technical field [0001] The invention relates to the construction field of an underground comprehensive pipe gallery, in particular to a rapid mixing construction method based on a prefabricated and assembled superimposed underground comprehensive pipe gallery. Background technique [0002] Today, the urban underground comprehensive pipe gallery is widely used more and more because of its comprehensiveness, long-term performance, maintainability, environmental protection and many other advantages. With the improvement of people's requirements for the performance of the comprehensive pipe gallery, the structure of the pipe gallery is becoming more and more complex, and the construction period is getting longer and longer. It is difficult for the traditional construction technology to meet the new requirements, especially for long-distance, multi-section and complex construction conditions. The underground comprehensive pipe gallery puts forward more stringent construction requ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045
CPCE02D29/10
Inventor 韩向科李猛郭会来邓伟马哲
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products