Smart construction site spraying linkage management system

A management system and construction site technology, applied in control/regulation systems, non-electric variable control, instruments, etc., can solve problems such as waste of resources, no monitoring of water levels in reservoirs, lack of control and protection of booster pumps, etc., to save labor costs , easy to understand the effect intuitively

Inactive Publication Date: 2018-11-13
CHINA MCC5 GROUP CORP
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] B. There is no monitoring of the water level of the reservoir used in the spray system, and the lack of control and protection of the booster pump may cause damage to the pump
[0005] C. There is no partition control of the spray system, resulting in a great waste of resources
[0006] D. Lack of a unified management platform, unable to evaluate the environment of each construction site in a timely manner, and lack of digital management basis
[0007] E. Lack of a means to visually display the construction environment of the construction site

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Smart construction site spraying linkage management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.

[0033] Such as figure 1 As shown, the construction site spray linkage management system includes an environmental monitoring unit, a spray dust reduction unit, an on-site linkage control and display unit, and a cloud intelligence management platform;

[0034] The spray dust suppression unit includes the automatic control cabinet of the booster pump, the booster pump (including the main booster pump and the backup booster pump); solenoid valve; float switch, smart meter (to monitor the working voltage, current, power, and power factor of the pump) , energy consumption and other data), smart water meter (monitoring the water consumption of the spray system); pipes and spray nozzles.

[0035] The environmental monitoring unit includes a noise...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction site spraying linkage management system which comprises an environment monitoring unit, a spraying dust reduction unit, an on-site linkage control and display unit and a cloud smart management platform. The spraying dust reduction unit comprises a pressurizing pump automatic control cabinet, a main pressurizing pump, a standby pressurizing pump, a floating ball switch, an intelligent electric meter, an intelligent water meter, an electromagnetic valve, a pipeline and a spraying nozzle, the environment monitoring unit comprises a noise and flying dust monitor, the on-site linkage control and display unit comprises an equipment gateway, a graphic display unit, an IO control unit, a communication conversion module and a DC 12V switch power source, and the cloud smart management platform contains multiple servers including a host-slave database server, an application server and a Web server. The system which is efficient realizes automatic running ofa spraying system, improves working efficiency and saves manpower cost of management personnel.

Description

technical field [0001] The invention relates to a construction site spray linkage management system. Background technique [0002] The difficulties in using the current construction site spraying system include: [0003] A. When to start and when to stop the spray system, the on-site personnel can only judge by human feeling, which is very different from the actual situation. [0004] B. There is no monitoring of the water level of the reservoir used in the spray system, and the lack of control and protection of the booster pump may cause damage to the pump. [0005] C. There is no partition control of the spray system, resulting in a great waste of resources. [0006] D. Lack of a unified management platform, unable to evaluate the environment of each construction site in a timely manner, and lack of digital management basis. [0007] E. There is a lack of a means of visually displaying the construction environment of the construction site. Contents of the invention ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G05D27/02
CPCG05D27/02
Inventor 邓杨均申新亭贾贵军王杨
Owner CHINA MCC5 GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products