A method and device for batch-extracting large-section data of rivers
A technology of large cross-sections and cross-sections, which is applied in the field of batch extraction of large-section data of rivers, can solve problems such as the inability to batch extract data of large cross-sections of rivers, and achieve the effects of saving work time and avoiding data errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The flow chart of the invention is as follows Figure 1 As shown in, a method for extracting large section data of rivers in batches includes the following steps:
[0048] 1, adopting the software with rectangular grid division and interpolation functions, setting grid nodes at the place where the cross section needs to be intercepted, and interpolating the elevation to the grid nodes;
[0049] 2, extracting DEM data of grid nodes;
[0050] Step 3, calculate the distance D between the nodes of the cross section. i And slope l i , if |d i+1 / d i | i+1 / d i |>5, and |l i+1 / l i |>1.1 or |l i / l i |<0.9, the node is divided into the next section; Otherwise, calculate the next node without dividing the section;
[0051] After traversing all the data, go to step 4;
[0052] Step 4, sorting the grid nodes in each section;
[0053] Step 5, sequentially calculating the distances between the ordered nodes, and accumulating to obtain the starting point distance of each grid node; And ...