Hoisting method of key components of offshore wind turbines
An offshore wind power and hoisting method technology, which is applied in wind power generation, wind turbines, cranes, etc., can solve the problems of high cost, uncontrollable schedule and expensive rent of wind power installation ships, and achieves a high degree of automation, smooth process and compact equipment. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0039] The hoisting process of key components of offshore wind turbines includes the following steps:
[0040] Step 1. If figure 2 As shown, the tugboat 1 carries machinery and equipment close to the tower;
[0041] Step 2. If image 3 As shown in , lift the small lifting bracket or the unit comes with a small crane to prepare for hoisting the docking platform and turning bracket;
[0042] Step 3. If Figure 4 As shown, hoist the docking platform and turning bracket;
[0043] Step 4. If Figure 5 As shown, through the main winch cable, under the action of the auxiliary winch, the main hoisting winch moves from the tugboat to the tower platform and fixes it;
[0044] Step 5. If Image 6 As shown, the small lifting bracket pulls the main hoisting winch to the docking platform, and passes the main winch cable to prepare for hoisting;
[0045] Step 6. If Figure 7 As shown in , the stand-up support rotates outward around the pin shaft, ready to dock with the main crane; t...