Method for estimating the installation benefit of fan tower lifter based on the utilization of abandoned air
A technology for elevators and fan towers, which is applied in the field of estimating the installation benefits of fan towers and elevators, can solve problems such as low maintenance efficiency of hidden safety hazards in life and so on.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0077] Based on the wind turbine tower elevator installation benefit estimation method based on the utilization of abandoned wind, the statistics of the abandoned wind power include the following steps:
[0078] Step 1: Statistics of abandoned wind power
[0079] Using the analysis of probability distribution and time series, the probability of each stage of curtailment of wind power between 10:00-20:00 every day is counted;
[0080] (1) Taking the abandoned wind power during the period of 10:00-20:00 every day as a data unit, set W max It is the maximum value of abandoned wind power. It is stipulated that ΔW represents the interval of abandoned wind power. Generally, ΔW=0.1Wmax is used, and S is used to represent 10 stages of abandoned wind power within the data collection range. If W is within 10:00-20:00 For any value of wind power, there is W∈{ΔW(i-1),ΔW·i};
[0081] Probability distribution is used to calculate the probability of each stage of wind power abandonment, an...
Embodiment 2
[0152] All the data in this example come from a wind farm in Dabancheng, Xinjiang. The installed capacity of the wind farm is 50MW, and there are 25 wind turbines of 2MW. At present, elevators are installed in some wind turbines. For the convenience of checking and calculation, it is assumed that all 25 wind turbines are installed Analysis with lift:
[0153] 1. Statistics of abandoned wind power:
[0154] Through MATLAB software programming, the data of the wind farm for one year is processed, and the probability distribution of each wind curtailment stage in the time period of 10:00-20:00 within a year is obtained, and the result is shown in Figure (3):
[0155] from above image 3 It can be seen that the phase of wind curtailment is mainly concentrated between 1T-4T, and the maximum value of wind power curtailment during working hours is 448.9 MW. Calculated by formula (2), the power curtailment of wind farms in the daily 10:00-20:00 time period is about It is 124.8MW. If...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com