Field operation terminals, servers and systems for substation cable laying
A technology for on-site operations and substations, applied in information technology support systems, instruments, data processing applications, etc., can solve problems such as low communication efficiency, improve efficiency, improve construction efficiency, and reduce the effect of carrying heavy cables back and forth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] This embodiment discloses an integrated cable laying system, such as figure 1 As shown, including: server, client and on-site operation terminal.
[0056] The server is deployed in the internal LAN of the design unit, and the design unit can perform normal access in the LAN through the client. Access to data at the work site must pass through a dedicated VPDN channel, and portable terminal devices perform VPDN authentication through an encrypted SIM card, and can communicate through a dedicated network after passing the authentication. The portable terminal device on the job site is connected to the handheld printer through Bluetooth technology. in,
[0057] The client is used for substation cable laying scheme planning, and the drawing data, intermediate data and planned laying strategies involved in the scheme planning are all uploaded to the server;
[0058] The on-site operation terminal is used to obtain cable laying strategies and other reference data during on-s...
Embodiment 2
[0110] The purpose of this embodiment is to provide a cable laying construction method based on an on-site operation terminal.
[0111] A cable laying construction method based on an on-site operation terminal, comprising:
[0112] When logging in to the on-site operation terminal for the first time, the access authority is obtained.
[0113] After gaining access, get recommended construction strategies.
[0114] Carry out cable laying. During the laying process, the handheld printer connected to the on-site operation terminal prints the label. The label format includes the screen cabinets at both ends of the cable to be laid. These two screen cabinets are used as the starting point and the end point respectively for printing, and pasting to both ends of the cable;
[0115] Every time the laying of a cable is completed, use the on-site operation terminal to mark the corresponding record in the cable list as completed;
[0116] According to the completion of cable laying, th...