Unlock instant, AI-driven research and patent intelligence for your innovation.

Method for managing initiating explosive device in construction base on BIM

A technology for pyrotechnics and management modules, applied in data processing applications, instruments, calculations, etc., can solve problems such as errors in manual recording of information, and achieve the effect of facilitating safety management and improving work efficiency

Inactive Publication Date: 2019-01-01
CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The present invention provides a BIM-based method for construction explosives management. A central processing system is established based on the BIM model, which realizes real-time and accurate grasp of the use and inventory of explosives warehouses, and improves the work efficiency of explosives warehouse personnel. , realized a series of information management on the purchase, warehousing, storage, warehousing, and withdrawal of pyrotechnics, solved the problem of error-prone manual record information of various data in the explosives warehouse, improved work efficiency, and realized The intelligent and informatized safety management of the explosives storehouse entry and exit enables the various data of the explosives storehouse to be concretized, visualized and rationalized

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for managing initiating explosive device in construction base on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] figure 1 It is a schematic diagram of a method for managing explosives in construction based on BIM in an embodiment of the present invention.

[0019] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0020] A method of BIM-based construction explosives management. This method is a series of information management methods based on BIM construction explosives procurement, storage, storage, delivery, and withdrawal. The method realizes the Hardware includes scanning device, host computer, central processing unit, access control device, alarm, etc.; scanning device includes Bluetooth scanner, barcode scanner and Bluetooth electronic tag; access control device includes explosion-proof door controller and fingerprint machine; scanning device and access control device are Connect with the host through the data line.

[0021] According to the geological design of the tunnel, a BIM model ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a management method of construction initiating explosive device based on BIM, a central processing system is established base on BIM model, the explosive warehouse can be real-time and accurately grasped the use and inventory of initiating explosive devices, improve the work efficiency of explosive depot personnel, It realizes a series of informationization management of initiating explosive device such as purchasing, entering, storing, discharging and returning, solves the problem that the data of explosive warehouse are easy to be mistaken, improves the work efficiency, realizes the intelligence of explosive warehouse entry and exit, the informationization safety management, and makes the data of explosive warehouse concrete, intuitionistic and rational. It realizes a series of information management of explosives purchase, storage, storage, storage, return and so on, so as to realize the intelligent and information safety management of explosives storage, andmake the data of explosives storage concrete, intuitionistic and rational.

Description

technical field [0001] The invention relates to the technical field related to the management of pyrotechnics for tunnel construction, in particular to a method for managing pyrotechnics for construction based on BIM. Background technique [0002] With the development of science and technology and the rapid development of the national economy, in order to realize the convenience and speed of transportation, the current construction of high-speed railways and expressways adopts optimized curve design. The blasting operation in the construction process has been increased, and the demand for explosives has greatly increased. At present, it is at the peak of my country's expressway and railway construction. The scale of the project is large, the geographical environment is complex, the natural conditions are greatly affected, and there are many blasting operations. The management of explosives used in construction sites is directly related to the construction progress of constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q10/08
CPCG06Q10/0875G06Q10/103
Inventor 刘松涛孙胜伟李海松赵静波
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD