Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

7results about How to "Avoid affecting the construction progress" patented technology

Greenhouse film applying device

The utility model relates to the technical field of greenhouses, in particular to a greenhouse film feeding device for a greenhouse. The device is arranged on the two sides of a greenhouse frame and comprises a film line pay-off frame, a film line take-up frame and a greenhouse film tensioning assembly, a greenhouse film line is arranged on the film line pay-off frame, the film line take-up frame is arranged at the position, corresponding to the film line pay-off frame, of the other side of the greenhouse frame, and the greenhouse film line is connected with the film line take-up frame after being wound around an arch frame of the greenhouse frame. The greenhouse film tensioning assembly is connected with the greenhouse film line, and the greenhouse film tensioning assembly is connected with a greenhouse film. The device is good in winding displacement accuracy and high in film feeding efficiency, an operator does not need to climb to a greenhouse frame, the construction safety is improved, the construction speed is increased, and the greenhouse construction efficiency is guaranteed. The utility model is mainly applied to the field of greenhouse film covering.
Owner:CHINA SHANXI SIJIAN GRP

A method for calculating the weight of forging blanks

The present invention provides a method for calculating the weight of forging blanks, which belongs to the technical field of metal forgings and includes the following steps: step 1, recording the dimensions of various parts of the forging according to the production requirements of the forging; step 2, setting the margin according to the production requirements of the forging; step 3, bringing the dimensions of various parts in step 1 and the margin in step 2 into the calculation formula to obtain the weight of the forging blanks. The present invention improves the accuracy of calculating the weight of forgings through calculation methods for different forgings; the present invention calculates the weight of forgings to provide a reference for purchasing forgings, thereby avoiding the influence of the construction progress on the weight of the purchased forgings being too much or too little; the present invention is simple to calculate and easy to implement.
Owner:BAOJI TIGO METAL TECH CO LTD

Hanging basket device for bridge construction

The utility model discloses a hanging basket device for bridge construction, and particularly relates to the technical field of hanging baskets, the hanging basket device comprises a hanging basket body, telescopic plates are inserted into the two sides of the hanging basket body, a moving mechanism for driving the two telescopic plates to move is arranged at the bottom end in the hanging basket body, and two connecting rings are fixedly arranged on the two sides of the top of the hanging basket body. Wherein one side of one telescopic plate is movably connected with a blocking door through a hinge, a fixing mechanism for fixing the blocking door is arranged in the telescopic plate located on the same side with the blocking door, and the moving mechanism comprises two bidirectional threaded rods arranged in the hanging basket body. The two telescopic plates are driven by the moving mechanism to move, the moving space in the hanging basket body can be enlarged, the use range is enlarged, the construction progress of a bridge is prevented from being affected, the blocking door can be fixed through the fixing mechanism, and the safety of workers is improved.
Owner:JINAN YELLOW RIVER CONSTRUCTION GROUP CO LTD

Design method of pumping type cage-shaped ball seat opening equal-drift-diameter sliding sleeve

PendingCN119062280ASolve Compatibility IssuesAchieve correct matching identificationSurveyData processing applicationsWell cementingOil field
The invention belongs to the technical field of oil field production well completion fracturing devices, and discloses a design method for a pumping type cage-shaped ball seat opening equal-drift-diameter sliding sleeve. The design method comprises matching design, specifically, a step of the pumping type cage-shaped ball seat and a sliding sleeve groove of an inner sliding sleeve of the well cementation sliding sleeve are correctly recognized and matched, namely when the length h of the step of the pumping type cage-shaped ball seat is larger than the length L of the sliding sleeve groove of the inner sliding sleeve of the well cementation sliding sleeve, the step of the pumping type cage-shaped ball seat cannot be clamped into the sliding sleeve groove and cannot be opened, and at the moment, the step of the pumping type cage-shaped ball seat cannot be opened. The deflection of the tail end of the step needs to be larger than that of the top end of the step, correct matching recognition of the ball seat and the well cementation sliding sleeve inner sliding sleeve is achieved, and the situation that the ball seat opens the well cementation sliding sleeve inner sliding sleeve by mistake, construction faults are caused, and the construction progress is affected is avoided. According to the design method, the structural parameters of the pumping type cage-shaped ball seat can be guided and determined, the pumping type cage-shaped ball seat is fed into an underground preset sliding sleeve through a ground pumping method, the underground sliding sleeve is identified and opened step by step, and fracturing operation is smoothly completed.
Owner:PETROCHINA CO LTD

Construction hanging basket operation risk real-time monitoring method and system

The invention relates to the technical field of bridge construction, in particular to a construction hanging basket operation risk real-time monitoring method and system. The method comprises the following steps: S1, deploying a monitoring system including sensing, transmission, data processing and early-warning brake layers; s2, early warning and braking threshold values are set; s3, the sensing layer collects parameters in real time in the walking process and transmits the parameters to the data processing layer through the transmission layer; s4, the processing layer preprocesses the data, calculates a displacement difference and a speed difference, and judges a balance state in combination with attitude parameters; and S5, executing continuous monitoring, primary early warning or secondary early warning and emergency braking according to a judgment result. In the system, a sensing layer comprises a high-precision laser displacement sensor, a tilt angle sensor and a stress monitoring module, a transmission layer adopts a'wired + wireless' mixed mode (delay is less than or equal to 0.5 s), a data processing layer comprises an edge computing terminal and a background monitoring center, and an early warning braking layer realizes graded prevention and control. According to the invention, automatic high-precision monitoring is realized, manual dependence is avoided, accurate early warning and braking are realized, overturning accidents are avoided, and construction safety and quality are improved.
Owner:CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +1

A building construction unloading platform

The utility model discloses a building construction unloading platform, including the platform, I -beam and the ring module of hanging, the both sides symmetry of platform front end are provided with the slot, the both sides integrated mould of I -beam rear end have inserted rod, and inserted rod inserts in the slot, and I -beam is detachably installed through inserted rod in platform front end, and the both sides outer wall of platform and be close to I -beam place fixedly welded have the bolt seat, and the bolt seat is movably inserted and is installed with the bolt, and the outside of bolt and be located in the spring of bolt seat sleeve, and the rear of inserted rod is penetrated and is provided with the insertion hole, the top fixedly welded with the ring of ring module, and the bolt is inserted in the screw hole in ring module rear penetration in the both sides symmetry of platform is provided with the screw hole, and the bolt is inserted in the screw hole in ring module rear penetration. The utility model has the advantages of stable structure and convenient installation and disassembly, and the unique connection design guarantees the platform stability and is convenient for maintenance, and multiple screw holes and the reasonable layout of ring module and protection structure adapt to multiple working conditions and ensure the safe and efficient operation.
Owner:ANHUI LEADER CONSTR CO LTD

Basement mortar rapid transportation device

The utility model belongs to the technical field of building construction, and discloses a basement mortar rapid transportation device which comprises a cleaning mechanism, a control mechanism and a supporting mechanism, the control mechanism is arranged on the top side of the supporting mechanism, the cleaning mechanism and the supporting mechanism are arranged in a clamped mode, and the supporting mechanism comprises a telescopic rod. A clamping rod is fixedly arranged on the lower portion of one side of the telescopic rod, the cleaning mechanism comprises an inclined supporting plate, a third gear rotating shaft is rotatably arranged on the top side of the inclined supporting plate, a cleaning plate is fixedly arranged on one side of a shaft body of the third gear rotating shaft, the control mechanism comprises a supporting block, and a second connecting rotating shaft is rotatably arranged on the top side of the supporting block. According to the technical scheme, through cooperation between the control mechanism and the supporting mechanism, the cleaning mechanism is controlled, maintenance and cleaning of the conveying mechanism are more convenient, mortar is directly conveyed from the first mortar pool to the second mortar pool, the idle time of the mortar is shortened, and the effect is better.
Owner:CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1