A dual-rise extracting method preventing and controlling rockburst

A rockburst, one-time technology, which is applied in mining and underground mines, can solve problems such as complex construction technology, hidden dangers of production safety, and especially severe rockburst phenomena, so as to reduce safety risks, ensure production safety, and improve resource utilization. Effect

Active Publication Date: 2019-01-15
HUBEI SHANSHUYA MINING SCI & TECH DEV
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the process of mining, the rock layer is in the original stress state before the mining of the ore seam, and the original balance state of the surrounding rock is destroyed after mining. Rockburst will occur when the brittleness and elasticity are high, especially as the mining depth continues to increase, the stress will increase, and the rockburst phenomenon is particularly severe. Workers exposed to the rockburst roof will have great production safety hazards. In addition, Rockburst often causes serious damage to the excavation face and equipment damage, which has become a worldwide problem in the field of underground engineering and rock mechanics
[0003] The traditional room-and-pillar mining method generally adopts the reserved mine wall method in areas with large buried depths and significant rockbursts. By controlling the exposed area of ​​the mine roof and reducing the stress of the surrounding rock, this method has a better effect in preventing rockbursts. But the disadvantage is that the recovery rate is too low, generally only 60%, which is a serious waste of resources
In terms of rockburst control, the existing prevention and control measures are mainly to strengthen the support and advance support of the surrounding rock, soften the rock with water, improve the rock properties, smooth blasting, etc. The advantage is that it can improve and alleviate the rockburst phenomenon to varying degrees. The disadvantage is that the construction process is complicated, the cost is high, and the output is affected.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A dual-rise extracting method preventing and controlling rockburst

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] In view of the fact that the roof of the lower phosphorus layer in Yichang is medium-thick dolomite and gray dolomite interbedded with psynonymous phosphorite, argillaceous psynonymous phosphorite strips or sandy debris, the rockburst phenomenon is remarkable at the burial depth of 200-450 meters. By changing the traditional technology, using the double-uphill excavation method to release the stress on the surrounding rock evenly at multiple points, reduce the degree of rockburst, improve the construction safety factor, reduce the difficulty of construction, and make effective use of mineral resources.

[0024] First: Arrange the mine house in the opposite direction in the thin ore body block, and simultaneously excavate two cuttings up the mountain on both sides of the mine house. Control the distance between the two uphills to be 6 meters, the width of the uphill is 3 meters, and the height is based on the thickness of the rich ore. Take the rich ore at one time, gener...

Embodiment 2

[0029] Example 2: Sujiapo Phosphate Mine is a typical sedimentary deposit with a burial depth of about 500 meters. The main out-of-vein development projects have been completed. Most of the middle-section development roadways are arranged along the veins. The single-headed excavation distance is long, and rockbursts are common. The tunneling speed is less than 40 meters per month. After the successful construction technology test of the double-up hill, try to construct the double-level lanes along the main road at the same time. It not only solved the severe rockburst in the double roadway, but also solved the problem of long-distance ventilation and the requirements for meeting cars, and achieved a good performance of 80 meters in monthly excavation. Since the roadway is constructed along the vein, the ore belt during the excavation can offset the construction cost, and it is now widely used in the excavation and excavation along the vein.

Embodiment 3

[0030] Example 3: The Yangliu Phosphate Mine, also in Yichang, is a super-large mine with a design of 4 million tons per year. It is now under construction. It is also a typical sedimentary deposit with a buried depth of 800 meters. The rockburst phenomenon is more severe. All protection methods have been tried, but the excavation speed is difficult to meet the planning requirements. After exploring the double uphill layout of the excavation construction, the rockburst has been significantly improved, and the alternate parallel construction has achieved a monthly progress of 75 meters. The progress of the project is 3 excavation cycles every two days. .

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A dual-rise extracting method preventing and controlling rockburst is provided. The method includes arranging a stope room in an ore body, simultaneously tunnelling at two sides of the stope room to obtain two cut rises, and extracting rich ore completely in one time; tunnelling the two cut rises and connection drifts in the upper part of the ore body to achieve a through effect; reserving positions for crown pillars, performing regressive type mining from top to bottom and from two sides to inside, and removing ore with a scraper mine winch; after extraction along the two cut rises, keeping sill pillars, and finishing recovery of residual ore in the stope room; and after ore mining is finished, arranging a next adjacent stope room along a transporting drift direction and performing miningwork of the next stope room according to abovementioned steps. Compared with traditional single-rise processes, the dual-rise (two cut rises) process adopts the two rises to bear breaking strength ofrock burst on stope room surrounding rock, stress on the original single rise is released in a multi-point manner, and rockburst caused by gusty buckling failure because the strength of stope room surrounding rock cannot bear centralized overhigh stress is reduced.

Description

technical field [0001] The invention relates to a mining method under the condition of special engineering geological structure, especially an underground mine with serious ground pressure, in order to ensure the safety of mining and improve the recovery rate. Background technique [0002] The room-and-pillar mining method has the characteristics of simple mining process, good ventilation, and low ore dilution rate. In the past two decades, due to the rapid development of tire-type and crawler-type rock drilling, loading, and handling equipment, it has reached a level near the level. For thicker ore deposits, the room-and-pillar method combined with trackless equipment can be used to realize large-scale mechanized mining, which greatly improves the production capacity of the mine, so it is widely used in underground mines at home and abroad. In the process of mining, the rock layer is in the original stress state before the mining of the ore seam, and the original balance st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/22
CPCE21C41/22
Inventor 吴保才姚会熊杰瞿定军邹珊珊
Owner HUBEI SHANSHUYA MINING SCI & TECH DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products