Prefabricated all-steel crown beam for foundation pit enclosure wall
A foundation pit enclosure and assembly technology, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of long construction period, inability to recycle, difficult demolition, etc., and achieve short construction period, convenient demolition and construction convenient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0042] Specific embodiment one: as figure 1 , figure 2 , Figure 6 , Figure 7 As shown, a prefabricated all-steel crown beam for the retaining wall of a foundation pit includes a number of steel beams 2 connected in sequence and a number of cover plates 4 for covering the steel beams. The retaining wall of the foundation pit includes a plurality of wall profile steels 1.2 distributed sequentially along the length direction of the retaining wall of the foundation pit, and the upper end of the wall profile steel protrudes above the ground surface.
[0043] Such as figure 1 As shown, the retaining wall of the foundation pit in this embodiment is an underground cement-soil continuous wall, which is constructed using the TRD construction method and the SMW construction method. (The wall profile steel is usually H-shaped steel), and the upper end of the wall profile steel protrudes above the underground cement-soil wall (that is, the upper end of the wall profile steel protrude...
specific Embodiment 2
[0054] Specific embodiment two: as figure 1 , figure 2 , Figure 8 As shown, a prefabricated all-steel crown beam for the retaining wall of a foundation pit includes a number of steel beams 2 connected in sequence and a number of cover plates 4 for covering the steel beams. The retaining wall of the foundation pit includes a plurality of wall profile steels 1.2 distributed sequentially along the length direction of the retaining wall of the foundation pit, and the upper end of the wall profile steel protrudes above the ground surface.
[0055] Such as figure 1 As shown, the retaining wall of the foundation pit in this embodiment is an underground cement-soil continuous wall, which is constructed using the TRD construction method and the SMW construction method. (The wall profile steel is usually H-shaped steel), and the upper end of the wall profile steel protrudes above the underground cement-soil wall (that is, the upper end of the wall profile steel protrudes above the...
specific Embodiment 3
[0072] Specific embodiment three: as figure 2 , Figure 10 , Figure 11 , Figure 12 As shown, a prefabricated all-steel crown beam for the retaining wall of a foundation pit includes a number of steel beams 2 connected in sequence and a number of cover plates 4 for covering the steel beams.
[0073] The retaining wall of the foundation pit includes a plurality of wall profile steels 1.2 distributed sequentially along the length direction of the retaining wall of the foundation pit, and the upper end of the wall profile steel protrudes above the ground surface.
[0074] Such as figure 1As shown, the retaining wall of the foundation pit in this embodiment is an assembled foundation pit retaining wall in which the wall section steel and the Larsen steel sheet pile are engaged, which includes a number of wall section steels distributed sequentially along the length direction of the foundation pit retaining wall 1.2 and certain Larsen sheet piles 1.3.
[0075] The wall sect...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


