A technology of concrete beams and connecting nodes, which is applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of cumbersome construction procedures and slow construction speed, and achieve the effects of fast construction speed, firm fixation and safe construction of components
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] combine Figure 1 to Figure 5 As shown, the connection node 1 between the steel column and the concrete beam in the reverse construction method provided by this embodiment includes a vertically arranged steel column 2 and a horizontally arranged concrete beam 3, and at the junction of the steel column 2 and the concrete beam 3 A steel bar 4 is welded on the steel column 2 below, and a shelving steel plate 5 is arranged on the steel bar 4 , and the longitudinal reinforcement (not shown) of the concrete beam 3 is fixed on the shelving steel plate 5 . The longitudinal reinforcing bars can be fixed by pads, or some vertical reinforcing bars can be set on the shelving steel plate 5, as the bracing frame of the longitudinal reinforcing bars, the longitudinal reinforcing bars are directly bound on the vertical reinforcing bars.
[0027] A preferred embodiment is to combine Figure 4 and Figure 5 As shown, the steel column 2 is circular, the steel strip 4 is circular, and th...
Embodiment 2
[0033] This embodiment provides a construction method for the connection node 1 of steel columns and concrete beams in the reverse construction method, which is combined below Figure 1 to Figure 5 , to further describe the construction method. The construction method includes:
[0034] According to the column bottom elevation of steel column 2 and the beam bottom elevation of concrete beam 3, calculate the position of concrete beam 3 and the connection node on steel column 2, and weld the steel plate at the position of the beam bottom elevation of concrete beam 3 at the connection node Strip 4; drive the steel column 2 vertically into the predetermined position; excavate the earth to the steel strip 4, hoop two semicircular annular steel plates 51 on the steel column 2, and weld the splicing ends of the two semicircular annular steel plates 51 to form The steel plate 5 is placed on hold, and the steel plate 5 is fixed on the steel strip 4; the steel bars of the concrete beam...