A TBM construction surrounding rock drillability grading method based on data mining

A technology of data mining and grading method, applied in data processing applications, instruments, forecasting, etc., can solve problems such as large errors, poor universality, and inability to project engineering graded forecasting.

Active Publication Date: 2019-04-26
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF6 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In 1999, N.Barton proposed the Q system based on the Q system taxonomy. TBM system, although the system considers the interaction between the rock mass and the TBM, if the lithology of the surrounding rock of the tunnel is quite different, the prediction error obtained by using this model will be large, and the system involves too many parameter indicators, It is difficult to be practical and cannot meet the classification requirements of the surrounding rock of TBM construction tunnels
[0004] Therefore, the existing surrounding rock grading and classification system is not universally applicable, and it is often impossible to make reasonable grading predictions for specific projects.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A TBM construction surrounding rock drillability grading method based on data mining
  • A TBM construction surrounding rock drillability grading method based on data mining
  • A TBM construction surrounding rock drillability grading method based on data mining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0064] A data mining-based excavability classification method for TBM construction surrounding rock, such as figure 1 As shown, the steps are as follows:

[0065] S1, establishing a penetration prediction model.

[0066] Preliminary preparation: collect TBM tunneling parameters and rock mass state parameter data in TBM construction cases, TBM tunneling parameters include TBM thrust, torque and other operating parameters, penetration and speed control paramete...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a TBM construction surrounding rock drillability grading method based on data mining, and the method comprises the steps: building a penetration prediction model by using a stepwise regression method and considering the operation experience of a master driver according to the principle of safety and high efficiency; Performing regression analysis on the engineering project,and establishing a rotating speed prediction model; Summarizing engineering cases at home and abroad, and establishing a TBM construction tunneling utilization rate prediction model on the basis of data mining; And by taking the TBM tunneling speed as an evaluation index, finally establishing a surrounding rock drillability grading model based on TBM construction. The method aims at the current situation that traditional tunnel surrounding rock classification is incapable of well adapting to TBM construction by taking surrounding rock stability as an evaluation basis. A data mining method isprovided, a tunnel surrounding rock systematized classification method under the TBM construction condition is established, the TBM tunneling performance under various surrounding rock grades is accurately predicted, a decision basis is provided for TBM construction cost and construction period prediction, and optimization adjustment of TBM tunneling parameters is achieved.

Description

technical field [0001] The invention relates to a method for grading excavability of surrounding rock in TBM construction, in particular to a method for grading the excavability of surrounding rock for TBM considering the excavability of surrounding rock and equipment adaptability. Background technique [0002] Compared with the traditional tunnel construction method, the TBM method has a fast construction speed, and usually the excavation rate is 3 to 10 times that of the traditional drill and blast method. However, TBM has poor adaptability to geological conditions. If the parameters do not match with it, TBM may not be able to take advantage of its fast excavation speed, which may cause delays in the construction period. [0003] Traditional tunnel construction methods generally design tunnel support and guide construction through the classification of surrounding rocks, and budget the cost and construction period accordingly. However, most of the current tunnel surround...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06Q50/08
CPCG06Q10/04G06Q10/06393G06Q50/08
Inventor 谭顺辉陈帅荆留杰杨晨张娜简鹏
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products