Construction method for simultaneous replacement of corbel brick and cooling section masonry of CDQ
A construction method and technology for CDQ coke ovens, which are applied to coke cooling, coke oven bricklaying operations, coke ovens and other directions, can solve problems such as inability to meet production, achieve the effect of meeting the requirements of normal production period and shortening construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Below in conjunction with accompanying drawing, the method for simultaneous construction of CDQ coke oven corbel brick and cooling section provided by the application will be further described,
[0025] The construction method of the present application comprises the steps:
[0026] 1. Preliminary preparations: before the start of construction, make the hanging pan in the furnace, that is, the above-mentioned partition board, shoulder beam, furnace roof beam, that is, the above-mentioned top support beam frame and fire channel support beam, and the load-bearing bracket of the middle bolt hole, that is, the above-mentioned and the following The shoulder pole beam and the corbel brick load-bearing beam are the above-mentioned load-bearing beams, and the platform support steel pipes are the above-mentioned support columns.
[0027] 2. After the start of work, discharge the coke to the bottom of the cooling section and assemble the hanging pan in the furnace. After the hang...