A fast technology for pulling bolts, applied in the connection of formwork/formwork/work frame, processing of building materials, preparation of building components on site, etc., can solve the problems of increasing site construction safety hazards, long operation time, and difficulty Problems such as high coefficients, to achieve the effect of reducing manpower input, reducing operating procedures, and saving construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A kind of tension bolt for rapid construction, including formwork 11, longitudinal support rod 12 and transverse support rod 13, double-ended screw rod 2, gasket 3, outer screw rod 4, clamp 51 and nut 52, such as figure 1 and figure 2 As shown, the specific structure is:
[0033] Formwork 11 joins together side by side successively to form a cylinder with a polygonal cross section. Longitudinal support bars 12 are vertically fixed on the outer surface of formwork 11, and transverse support bars 13 are horizontally fixed on the outer surface of formwork 11. Formwork 11 1. The longitudinal support bar 12 and the transverse support bar 13 all have positioning holes and the positioning holes of the three are aligned with each other, and the horizontal and vertical distances of the positioning holes are not less than 600mm;
[0034] Such as figure 1 As shown: screw holes are provided on both end surfaces of the double-ended screw 2, and the end surface of the double-ended...