Construction technology of a cantilever roadheader for a double-track large-section tunnel adjacent to a high-speed railway
A technology of cantilever roadheader and construction technology, which is applied in tunnels, mining equipment, earthwork drilling and mining, etc. It can solve the problems of affecting the construction period, less use, and large disturbance of existing lines, and achieve the effect of ensuring construction safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] The second branch of the 3rd bid for the station front project of the southwest ring line of the new railway Guiyang hub. The line starts from Gui'an Avenue, passes through Wangguan Village, Xinmin Village, Lanhuapo, Xingcheng Village, Pengguan Village, Dapo Village, and ends at Haozhi Village. The starting and ending mileage is D4K43+197.150~D2K58+945.451, and the total length of the line is 14.346km. Among them, Pengguan Village No. 1 Tunnel has a total length of 144m and a maximum buried depth of about 29m. The surrounding rock of the whole tunnel is graded as V, and the distance from the center of the Shanghai-Kunming High-speed Railway is 50-70 meters. It is a low-gas coal-measure formation. Pengguan Village No. 2 Tunnel has a total length of 676 meters and is located at the junction of Guanshan Lake District and Huaxi District in Guiyang City. The entrance is Huaxi District and the exit is Guanshan Lake District. The entrance section of the tunnel is adjacent to t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


