Construction process for replacing hoisting head rope of mine
A construction technique and hoisting rope technology, which is applied to lifting equipment, transportation, and packaging in mines, can solve the problems of high labor intensity, low safety factor, and low rope changing efficiency, and reduce the labor intensity of workers , Improve the efficiency of rope change and shorten the effect of rope change time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] This embodiment provides a construction process for replacing the hoisting head rope in a mine, including:
[0031] The equipment is in place: stop the container II on one side at the wellhead platform, and stop the container I on the other side at the bottom platform;
[0032] Introduce the old rope: disconnect the old rope that needs to be replaced on the side of the container II from the container II, and the hoist runs forward to lead out and recover the old rope that needs to be replaced from the disconnected rope head;
[0033] Collection of old ropes: The hoist continues to run forward, lowers the container II, and at the same time, continues to recover the old ropes that need to be replaced to the outside of the wellhead. When the container I rises to the wellhead position, the hoist stops. The recovery of the old rope that needs to be replaced is completed;
[0034] Rope overturning: disconnect the old rope that needs to be replaced on the side of the containe...
Embodiment 2
[0041] In this embodiment, the equipment involved in the construction process of replacing the first rope of mine hoisting mainly includes a rope guide wheel 3, a rope changing device 4, a rope receiving winch 5 and a rope releasing winch 6, and the rope receiving winch 5 is equipped with a collection old rope 10 Empty rope reel, put the new rope reel of new rope 11 on the rope winch 6.
[0042] Such as figure 1 , figure 2 and image 3 Shown is a construction technique for replacing the hoisting head rope of a mine, comprising the following steps:
[0043]Step 1: Put the equipment in place. Put the rope changing device 4, the guide wheel 3, the rope receiving winch 5 and the rope releasing winch 6 into place, the rope changing device 4 is arranged at the wellhead, the rope guide wheel 3 is close to the hoisting head rope, and the rope receiving winch 5 and the rope-laying winch 6 are installed behind the rope changing device 4, and the container II7 on the side close to t...
PUM