Curtain ordering system
A curtain and data technology, applied in the direction of buying and selling/leasing transactions, can solve the problems of complex calculation, low personalization, and high error rate, and achieve the effect of accurate cost calculation, good immediacy, and good personalized selection.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] like Figure 1 to Figure 3 As shown, a curtain ordering system includes an input module, an order module, a database server module, a material calculation module, a process calculation module, a cost calculation module and a display module;
[0034] The input module is used to input the curtain type data in the order;
[0035] The order module, according to the data entered into the module, judges the curtain type data and then enters the corresponding order module, and enters the database server module to find the corresponding data;
[0036] The database server module is used to receive the data of the order module and perform data processing, including the data storage module, the material algorithm module, the process algorithm module, and the cost calculation module; the data storage module is used to access the curtain data of the order; The material algorithm module is used to set the material algorithm and calculate it; the process algorithm module is used to s...
Embodiment 2
[0055] Enter the user's order information into the system, and then pass the order information to the database server module. The order information is:
[0056] Required cropping width w=1.12;
[0057] Get the corresponding fabric width k=2.75;
[0058] Cutting number n=2;
[0059] In the case of w>k, calculate according to formula ①:
[0060] The number of blocks that can be cut per frame p=k / w: 2.75 / 1.12=2, according to the formula c=n / p: 2 / 2=1;
[0061] Material meter and cost calculation:
[0062] Required length = 0.51 meters;
[0063] Cost unit price = 80 yuan;
[0064] The number of meters used = 0.51*1 = 0.51 meters;
[0065] Cost price = 0.51*80 = 40.8 yuan.
Embodiment 3
[0067] Enter the user's order information into the system, and then pass the order information to the database server module. The order information is:
[0068] w=3.06 required cutting width;
[0069] k=2.75 Get the corresponding fabric width;
[0070] n=2 cutting opening number;
[0071] In the case of w
[0072] x=0 extra material is 0;
[0073] According to the formula p 0 = Take the remainder (w / (k-x)): 3.06 / (2.75-0) take the remainder equal to 0.31;
[0074] According to the formula c 0 = Take the remainder w / (k-x): 3.06 / (2.75-00) is rounded down to 1;
[0075] According to the formula p = round down (k-x) / p 0 : (2.75-0) / 0.31 is equal to 8;
[0076] according to c 1 = Round up n / p: 2 / 8=1;
[0077] According to the number of frames c=c 0 *n+c 1 : 1*2+1=3.
[0078] Material meter and cost calculation:
[0079] Required length = 0.48m;
[0080] Cost unit price = 100 yuan;
[0081] The number of meters used = 0.48*3 = 1.44 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com